13.07.2015 Views

underline-strikeout version of the final draft ordinance - Pima County ...

underline-strikeout version of the final draft ordinance - Pima County ...

underline-strikeout version of the final draft ordinance - Pima County ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

For May 4, 2010 BOS HearingTHIS THE CLERK OF THE BOARD FORMAT!!!those contained in recognized building cost estimating guides may be considered only if suchfactors are included in a report prepared by an independent pr<strong>of</strong>essional appraiser and supportedby a written explanation <strong>of</strong> <strong>the</strong> differences. (Ord. 2005-FC2 § 2 (part), 2005)16.08.50490Mean sea level."Mean sea level," for purposes <strong>of</strong> <strong>the</strong> NFIP, means <strong>the</strong> National Geodetic Vertical Datum(NGVD) <strong>of</strong> 1929 or o<strong>the</strong>r datum to which base flood elevations are referenced, as shown on acommunity's FIRM. (Ord. 1999 FC-1 § 1 (part), 1999; Ord. 1988 FC-2 Art. 4 (part), 1988)16.08.5100Mesoriparian."Mesoriparian" for purposes <strong>of</strong> this title, means riparian habitat designated as mesoriparian onmaps adopted by <strong>the</strong> Board. These riparian habitats generally are associated with perennial orintermittent watercourses or shallow groundwater. Plant communities may be dominated byspecies that are also found in drier habitats (e.g., mesquite), but contain some preferentialriparian plant species such as ash or netleaf hackberry. (Ord. 2005 FC-2 § 2 (part), 2005)16.08.5210Mining reclamation plan."Mining reclamation plan" means a plan for sand and gravel operations that defines hydrologicand hydraulic constraints; outlines methods <strong>of</strong> extraction, operation and site development; andprovides procedures for <strong>final</strong> site reclamation pursuant to <strong>the</strong> Arizona Aggregate Mined LandReclamation Act in Title 27 <strong>of</strong> <strong>the</strong> Arizona Revised Statutes (A.R.S. §27-1201, et seq.). (Ord.2005 FC-2 § 2 (part), 2005)16.08.5320New construction."New construction" means structures and any subsequent improvements to such structures forwhich <strong>the</strong> "start <strong>of</strong> construction" commenced on or after <strong>the</strong> effective date <strong>of</strong> adoption <strong>of</strong>:A. An initial FIRM or after December 31, 1974, whichever is later, within federally regulatedflood hazard zones.B. This title for floodplain management regulations including regulation <strong>of</strong> erosion and riparianhabitat as provided herein this title. (Ord. 2010 FC-1)16.08.530Nonconforming use.“Nonconforming use” means an existing legal use that does not comply with this Title and wasei<strong>the</strong>r:A. Constructed prior to December 16, 1974, which predates <strong>the</strong> requirement for writtenauthorization for development within a floodplain, orB. Constructed on or after December 16, 1974, in compliance with <strong>the</strong> terms and conditions <strong>of</strong><strong>the</strong> written authorization in effect at <strong>the</strong> time <strong>of</strong> construction. (Ord. 2010 FC-1)16.08.540Obstruction.19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!