13.07.2015 Views

underline-strikeout version of the final draft ordinance - Pima County ...

underline-strikeout version of the final draft ordinance - Pima County ...

underline-strikeout version of the final draft ordinance - Pima County ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

For May 4, 2010 BOS HearingTHIS THE CLERK OF THE BOARD FORMAT!!!bridges or rock outcrops, and changes in <strong>the</strong> direction, amount, and velocity <strong>of</strong> flow <strong>of</strong> <strong>the</strong> watersin <strong>the</strong> watercourse.C. For constructed channels, channel banks are required to be stabilized to prevent erosion alongminor watercourses with base flood peak discharges <strong>of</strong> less than 2,000 cfs, but greater than 500cfs. Stabilization is required unless a variance waiver to <strong>the</strong> requirement is granted by <strong>the</strong> ChiefEngineer based on an engineering study, prepared and sealed by an Arizona registeredpr<strong>of</strong>essional civil engineer, which demonstratesing an appropriate building setback for an ear<strong>the</strong>nchannel, based on soil and natural flow conditions. For constructed channels with a base floodpeak discharge <strong>of</strong> less than 500 cfs, channel stabilization may be required based on engineeringanalysis and assessment <strong>of</strong> soil conditions and flow velocities. (Ord. 2010 FC-1; Ord. 2005 FC-2§ 2 (part), 2005; Ord. 1999-FC-1 §§ 1 (part) 1999; Ord. 1988-FC2 Art. 12 (B), 1988)16.28.040Appeals and variances.A. Appeals. Any applicant property owner requesting an appeal <strong>of</strong>disputing a written findingdecision or technical interpretation by<strong>of</strong> <strong>the</strong> Chief Engineer denying a permit or delineating anerosion hazard setback may appeal to <strong>the</strong> Board as provided in Chapter 16.56 <strong>of</strong> this title.B. Variances. Any property owner requesting a variance from <strong>the</strong> requirements <strong>of</strong> this Title shallsubmit a request for a variance to<strong>of</strong> <strong>the</strong> Board through <strong>the</strong> Chief Engineer as provided in Chapter16.56 <strong>of</strong> this title. (Ord. 2010 FC-1; Ord. 2005 FC-2 § 2 (part), 2005)Chapter 16.30WATERCOURSE AND RIPARIAN HABITAT PROTECTION AND MITIGATIONREQUIREMENTSSections:16.30.010 Purpose.16.30.020 Description.16.30.030 Applicability.16.30.040 Permits.16.30.050 Mitigation.16.30.060 Review process.16.30.070 Appeals and variances.16.30.080 Riparian habitat maps.16.30.010Purpose.The purpose <strong>of</strong> this chapter is to promote stable flow and sediment transport conditions, preservenatural floodplain functions, and provide watercourse management by preserving and/orenhancing riparian vegetation and habitat along watercourses and floodplains and to:A. Promote benefits provided by riparian habitat resources, including but not limited to,groundwater recharge, natural erosion control and protection <strong>of</strong> surface-water quality.B. Ensure <strong>the</strong> long-term stability <strong>of</strong> natural floodplains and survival <strong>of</strong> <strong>the</strong> full spectrum <strong>of</strong> plantsand animals that are indigenous to <strong>the</strong> <strong>County</strong> by:1. Assuring riparian habitat acreage and existing or natural functional values are not diminishingduring development;49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!