13.07.2015 Views

underline-strikeout version of the final draft ordinance - Pima County ...

underline-strikeout version of the final draft ordinance - Pima County ...

underline-strikeout version of the final draft ordinance - Pima County ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

For May 4, 2010 BOS HearingTHIS THE CLERK OF THE BOARD FORMAT!!!D. The Chief Engineer may require hydrologic, hydraulic, geomorphic, and riparian habitatanalyses that address both existing and future conditions, as well as <strong>the</strong> impacts that couldpotentially occur during grading and construction. (Ord. 2010 FC-1; Ord. 2005 FC-2 § 2 (part),2005)16.42.040Grading or alterations in sheet flooding areas.A. Grading or any alteration that diverts, obstructs, or retards <strong>the</strong> flow <strong>of</strong> flood waters is subjectto <strong>the</strong> provision <strong>of</strong> this title and shall require permits as specified within this title.B. Slope protection and terracing to control surface drainage, erosion, and debris on cut or fillslopes may be required in accordance with <strong>the</strong> floodplain use permit and <strong>the</strong> adopted GradingDesign Manual.C. In accordance with <strong>the</strong> Grading Design Manual, erosion control shall be implemented andmaintained in order to prevent erosion <strong>of</strong> slopes and cleared, brushed, grubbed, or graded areas.(Ord. 2005 FC-2 § 2 (part), 2005)66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!