13.07.2015 Views

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PageEPMC SERVICES FOR REWARI – KANPUR PIPELINE PROJECTBASIS OF DESIGN (PIPELINE)Any inconsistencies critical to the design shall be brought to the attention of the Purchaser forresolution.Specification / code breaks shall be indicated in the drawings for tie-in and modifications. These shallbe reviewed by HPCL / WP before implementation.3.2 Regulatory RequirementsAll aspects of the Project (i.e. design, construction, <strong>com</strong>missioning and operation) shall <strong>com</strong>ply withthe requirements of PNGRB and the latest versions of all relevant local regulatory requirements.Impact to any regulatory approval to the existing system due to modifications for tie-ins shall bepointed out by WP, reviewed by HPCL and approval obtained before proceeding with the design.n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\02 bod\working\mh2145-c000-pl-bod-0001_rev 0 .doc EV435-JH0902-00-GEN-BOD-0001 Rev 010 of 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!