13.07.2015 Views

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PageEPMC SERVICES FOR REWARI – KANPUR PIPELINE PROJECTBASIS OF DESIGN (PIPELINE)5.10.6 Pipeline BendsPipeline horizontal and vertical direction changes shall be ac<strong>com</strong>plished using bending methodsincluding roping, cold field and hot formed induction bending.5.10.7 Roped BendsRoped bends are achieved using the natural flexibility of the pipe. The stress introduced by itscurvature will be calculated to ensure that the pipeline will not exceed maximum stress levels as perASME B 31.4.5.10.8 Cold Field BendsField bends are formed by the cold bending process in accordance with an approved Procedure andOISD-141 Clause 11.6.The cold field bends for the Rewari to Kanpur pipeline shall have minimum radius of 40D as per OISD141.Back-to-back cold field bends are not permitted. A minimum 2m tangent for each bend shall beprovided.5.10.9 Hot Formed BendsInduction bends are to be installed at the below-above ground transitions (goose necks) at stations orwhere the bend angle is greater than 18ºInduction bends shall be minimum 6D radius which is <strong>com</strong>patible for use of intelligent pigging devices.A tangent of 1000 mm for each bend shall be provided.The post bending wall thickness of the bend shall meet the minimum thickness requirements forstraight length pipe. Sufficiently thick walled pipe shall be used for induction bends to account for thewall thinning resulting from the bending process.5.11 Special CrossingsCrossing design shall incorporate the minimum design requirements as provided on the alignmentsheets and requirements of the relevant Authority. In general, special crossings shall be installed withstandard wall pipe (unless noted otherwise on the alignment sheets) and shall be cased. (Note – it is<strong>WorleyParsons</strong> preferred design for the void between the casing pipe and carrier pipe shall be filledwith a cementaceous material (Bentonite clay) and vent/drain pipes not be used, however, therequirements of the relevant Authority shall prevail).5.11.1 Road CrossingAll road crossings shall meet the requirements of API 1102, OISD-141 and relevant StatutoryAuthorities permission.n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\02 bod\working\mh2145-c000-pl-bod-0001_rev 0 .doc EV435-JH0902-00-GEN-BOD-0001 Rev 026 of 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!