EPMC SERVICES FOR REWARI – KANPUR PIPELINESPECIFICATION FOR PIPELINE MARKER POSTS & SIGNS7. ROU BOUNDARY MARKERRight-of-Use boundary markers shall be fabricated as per the drawings and shall beinstalled at every 250 meters interval along the entire pipeline route. These shall be installed on eitherside of the pipeline alignment to define the ROW boundary limits. These shall also be installed atpipeline turning points to maintain the continuity of the ROW limits. Refer WP Standard Drawing No.MH2145-C000-PL-DST-0010-2B for details.n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for pipeline marker posts &signs\mh2145-c000-pl-spc-0019.docMH2145-C000-PL-SPC-0019 RevA Page 10 of 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!