EPMC SERVICES FOR REWARI – KANPUR PIPELINESPECIFICATION FOR DOCUMENTATION FOR PIPELINE CONSTRUCTION2. RECORDSThe CONTRACTOR shall submit daily, weekly, monthly and after <strong>com</strong>pletion, to the WP/HPCL,various records and reports for WP/HPCL's documentation purpose during and immediately after theconstruction. This shall as a minimum include, but not limited to the following:2.1 Daily• Separate progress reports of all crews• Daily welding results and repairs• Actual weather conditions• Application for deviations, if any• Accidents• Damages• Activities required from WP/HPCL• Materials Receipts• Urgently required materials2.2 Weekly• Up-to-date list of confirmed Site Instructions issued by WP/HPCL• Materials 'taken over'• Materials defects and repairs• Outstanding activities of WP/HPCL• List of installed markers, chainage• Required approval form WPn:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for documentation for pipelineconstruction\mh2145-c000-pl-spc-0021.docMH2145-C000-PL-SPC-0021 RevA Page 5 of 12