13.07.2015 Views

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PageEPMC SERVICES FOR REWARI – KANPUR PIPELINE PROJECTBASIS OF DESIGN (PIPELINE)5.10.3 Corrosion Coating – Joints, Bends and FittingsA suitable joint coating system <strong>com</strong>patible with the primary coating system shall be selected such asan epoxy primed 3 layer heat shrink sleeves (HSS), e.g. DIN EN C HT (60) UVIt is essential that the joint coatings are fully <strong>com</strong>patible with the linepipe coating and have a goodbond to it. They should have the same performance as the linepipe coating in their protection of thesteel, resistance to cathodic disbonding, and resistance to mechanical damage.A suitable coating system <strong>com</strong>patible with the primary coating system shall be selected for hot formedbends, fittings and buried valves.5.10.4 Cathodic ProtectionImpressed Current Cathodic Protection (ICCP)The pipeline shall be protected by ICCP systems located at the pump stations, Intermediate stationreceiving stations and selected sectionalising valve (SV) stations. Power supply shall be from thestation power supplies.Design of the CP system shall be in accordance with the following principles:• The design life for permanent impressed current ground beds is 35 years at maximum currentoutput. The actual life will be a function of ground bed operating current output. The designlife for temporary sacrificial anode ground beds is 2 years. Other CP system <strong>com</strong>ponentsshall be designed to conform to the pipeline facilities design life.• Inline insulating joints shall be installed in the pipeline at pump stations between the pipelineand each offtake and at selected SV’s, wherever ICCP stations are installed, to break thepipeline into separate electrical entities. The ICCP system shall be optimally designed so asto minimise insulating joints at SV’s.• Generally ICCP systems shall be installed at the start and end of the pipeline, at each end ofthe electrically separate pipeline sections and at selected locations between these sections.• Except for the start and end of the pipeline, and selected locations between the ends ofelectrically separate pipeline sections, the impressed current system shall be based on dualoutputconstant potential CP units, one output powering the upstream pipeline and one outputpowering the downstream pipeline.• At the start and end of the pipeline and selected locations between the ends of electricallyseparate pipeline sections, only one CP unit shall be installed.• Sufficiently short electrically separate pipeline sections shall be protected from one end,should design calculations show that this may be achieved.n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\02 bod\working\mh2145-c000-pl-bod-0001_rev 0 .doc EV435-JH0902-00-GEN-BOD-0001 Rev 023 of 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!