13.07.2015 Views

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PageEPMC SERVICES FOR REWARI – KANPUR PIPELINE PROJECTBASIS OF DESIGN (PIPELINE)• Marker Tape over length of crossing.• A warning signpost shall be placed on one side of the crossing.• Heavy wall line pipe thickness shall be used for crossing of road.• No casing (subject to confirmation that traffic wheel loads are acceptably low to not over stressor fatigue the pipeline in accordance with API RP 1102).5.11.5 Future Road CrossingsAny formally planned road that crosses the Right of Way. These crossings have:• 1500mm min. cover from top of carrier pipe to the top of the road surface.• A warning signpost shall be placed on one side of the crossing.• Marker Tape over length of crossing.• Standard wall pipe to the boundary.5.11.6 Railways CrossingsAll railway crossings are bored and cased with:• 1700mm min. cover from top of carrier pipe to the top of the ballast surface including the invertof the table drains.• The casing pipe shall be at least three nominal pipe sizes larger than carrier pipe.• Casing pipe to be installed by horizontal boring method and extend the full width of the railreserve.• End seals at both ends of the casing pipe. The end seals shall make provision for the twoHDPE ducts.• Casing insulators and end seals shall be provided to isolate carrier and casing pipes• Warning markers shall be installed on both sides of the crossing.• The crossing angle shall be as close to 90° as possible.• Heavy wall carrier pipe to the rail right-of-use boundary.• Cathodic protection test point to monitor casing / carrier pipe electrical isolation.• The railway crossings shall <strong>com</strong>ply with the requirements of API 1102 and Indian RailwayAuthorities.• Bentonite clay material shall be filled between casing and carrier pipe.n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\02 bod\working\mh2145-c000-pl-bod-0001_rev 0 .doc EV435-JH0902-00-GEN-BOD-0001 Rev 029 of 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!