13.07.2015 Views

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EPMC SERVICES FOR REWARI – KANPUR PIPELINESPECIFICATION FOR WELDING ON ONSHORE PIPELINE28. RECORDSPermanent records shall be made, with full supporting information of all welds, including repairsand re-welds. Records shall include a pipe tracking system or field drawing, which identifies thefinal location, coordinates of each pipe and weld.In addition to hard copies, all project welding procedures (WPS and PQR) shall be furnished ondiskettes with suitable software.All welding repairs shall be reported to the OWNER on a monthly basis per spread and per welder/automatic machine, with analysis of the type of defects. This shall be presented in a softwarepackage approved by OWNER.n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\06 spec\specification for welding on onshorepipeline\mh2145-c000-pl-spc-0020.docMH2145-C000-PL-SPC-0020 RevA Page 39 of 42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!