13.07.2015 Views

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

Pipelaying Tender-VOL II - WorleyParsons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PageEPMC SERVICES FOR REWARI – KANPUR PIPELINE PROJECTBASIS OF DESIGN (PIPELINE)adequately supported, guided or anchored so as to prevent undue vibration, deflection orloads on connected equipment such as filters, meters etc.5.3 Location of Pipeline Facilities• DISPATCH TERMINAL - REWARIThe proposed Despatch terminal is located at Rewari. Pipeline facilities at dispatch stationshall consist of Pig Launcher, Basket Filter, Mainline Pump, Existing Sump Pump & Tank,Flow Meter, Pressure Control Valves etc.• RECEIPT TERMINAL - KANPURThe proposed Receipt terminal is located at Kanpur. Pipeline facilities at receipt station shallconsist of Pig Receiver, Basket Filter, Sump Pump & Tank, Flow Meter, Pressure ControlValves etc.• INTERMEDIATE TAP-OFF / RECEIPT STATION - BHARATPURThe proposed Intermediate Tap-off / Receipt station is located at Bharatpur. Pipeline facilitiesat this station shall consist of Scraper Launcher and Receiver, Basket Filter, Sump Pump &Tank, Flow Meter, Pressure Control Valves and future pumping station etc.• INTERMEDIATE PIGGING / RECEIPT STATION - MATHURAThe proposed Intermediate Pigging / Receipt station is located at Mathura. Pipeline facilitiesat this station shall consist of Pig Trap, Basket Filter, Sump Pump & Tank, Flow Meter,Pressure Control Valves and future pumping station etc.• INTERMEDIATE PIGGING / PUMPING STATION – SAYYADPUR PRANThe proposed Intermediate Pigging / Future Pumping station is located at Sayyadpur pran.Pipeline facilities at this station shall consist of Pig Trap, etc.• SECTIONALIZING VALVES11 Nos. Sectionalizing Valves station envisaged in the proposed Pipeline.Schematics of Pipeline facilities are also indicated in Drawing No. 513-MH2145-C000-PL-DSD-00015.4 Pipeline MaterialsPipeline and its appurtenances shall be provided with carbon steel materials suitable for theintended service, as indicated below:• LINEPIPELinepipe shall conform to API specification 5L, PSL-2. The process of manufacture of linepipeshall be electric welded (EW) / longitudinal seam submerged arc welded (LSAW) / helicaln:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\02 bod\working\mh2145-c000-pl-bod-0001_rev 0 .doc EV435-JH0902-00-GEN-BOD-0001 Rev 014 of 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!