Pipelaying Tender-VOL II - WorleyParsons.com
Pipelaying Tender-VOL II - WorleyParsons.com
Pipelaying Tender-VOL II - WorleyParsons.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PageEPMC SERVICES FOR REWARI – KANPUR PIPELINE PROJECTBASIS OF DESIGN (PIPELINE)D/tw Ratio1. It is re<strong>com</strong>mended a heavier wall thickness pipe be used for crossings section than isrequired for adjacent section.OISD 141 Clause 5.1.6.3 requires the selection of pipe to have an outside diameter to wall thicknessratio (D/t ratio) not greater than 100 to avoid mechanically handling difficulties (susceptibility toflattening, ovality, buckling and denting). <strong>WorleyParsons</strong> re<strong>com</strong>mends D/t ratio not greater than 96 –this shall be adopted for the Project.5.10 Corrosion Protection5.10.1 Corrosion AllowanceCorrosion allowance for the pipeline systems is 0.5 mm.5.10.2 Corrosion Coating – LinepipeThe selected corrosion coating shall be suitable for the design temperature range specified in theProcess Design Basis.It is proposed to provide corrosion protection of the buried pipeline using external 3 layerPolyethylene coating for the pipelines. The total thickness of the coating shall be minimum 2.2 mmnormal type (n) as per DIN 30670. All field joints shall be coated with heat shrinkable sleeves.In addition to the corrosion coating, the entire buried portion of pipeline system shall be provided withImpressed Current Cathodic Protection System. No internal coating is envisaged. However, suitablecorrosion inhibitor injection system shall be provided.3LPE Coating ThicknessesPipeline Section Service [1] Coating Thickness in Microns(μm)FBE Adhesive HDPE TotalRewari to KanpurNormal 150 200 1850 2200Abrasive 150 200 2550 2900Notes:1. Abrasive service indicates areas where pipeline will be installed by trenchless method(HDD, boring, etc.) or areas where rock/ abrasive material may be present. Theselocations will be nominated on the alignment sheets.n:\513-mh-2145-rkpl\11 engineering\11.8 pipelines\02 bod\working\mh2145-c000-pl-bod-0001_rev 0 .doc EV435-JH0902-00-GEN-BOD-0001 Rev 022 of 34