PDF Download - Deutsche Bahn AG
PDF Download - Deutsche Bahn AG
PDF Download - Deutsche Bahn AG
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
|<br />
mAN<strong>AG</strong>EmENT rEPOrT<br />
Testing and approval agreements are also signed with customers<br />
outside DB Group. DB Systemtechnik bundles all of our railway<br />
expertise. It offers manufacturers the use of its certified testing<br />
laboratory at an early stage of the development process. This<br />
early consultation on approval and testing requirements, par-<br />
ticularly for European approval processes, optimizes costs and<br />
efforts, and significantly accelerates the approval process. During<br />
the year under review, such approval tests were carried out on<br />
behalf of industrial firms for vehicles such as Desiro, E-Lok<br />
Vectron, ETr 610, X 61, XrE and TGV Duplex for Germany and<br />
other European countries.<br />
Comprehensive system optimizations comprising the further<br />
development of technology for the infrastructure and vehicles<br />
are extremely important for the rail mode of transport. Based<br />
on this task we are driving technical innovations needed to<br />
ensure commercial success and that contribute to a constant<br />
increase in production efficiency as well as operational quality.<br />
In the year under review, for example, we concluded the “GZ<br />
1000” project, proving that freight trains with a length of up to<br />
1,000 m were feasible.<br />
Research and development<br />
As a service provider, DB Group does not conduct its own<br />
research and development in the narrow sense of the term.<br />
Due to our technological competence and broad operational<br />
experience, we do, however, initiate user-oriented developments<br />
and support industrial firms with services including extensive<br />
testing capabilities.<br />
proCUreMent<br />
The procurement of materials and services from the external<br />
supplier market is a significant lever to control processes and<br />
influence cost structures. A uniform Group-wide procurement<br />
policy allows standardized handling processes to be applied,<br />
and also ensures a uniform appearance in the market.<br />
The year under review was still largely influenced by the<br />
after-effects of the economic and financial crisis. In order to<br />
counteract this, we established a program for optimizing supply<br />
services in the procurement area. Within the framework of this<br />
program all of the product groups were subjected to a systematic<br />
analysis of their needs and potential levers.<br />
Optimized life cycle costs are a key criterion here. In addition<br />
to the immediate cost issues, the focus was primarily on capitalintensive<br />
investments in order to optimize the level of committed<br />
capital.<br />
These activities were supported by the parallel launch of<br />
international procurement teams. The purpose of these teams<br />
is to implement best-buy strategies in the global supplier context.<br />
The goal here is to create savings and anchor them in global<br />
framework agreements.<br />
In addition to the immediate program building blocks to<br />
optimize procurement services, progress was also achieved for<br />
significant strategic purchasing tools: during the year under review<br />
a new supplier management system was introduced. This is a<br />
defined overall process that qualifies, evaluates and develops<br />
suppliers. Using continuous IT support, it creates a tool for strategic<br />
procurement that can systematically develop our portfolio<br />
of suppliers, improve its quality and inspire innovations. This also<br />
includes creating the corresponding content-related concepts.<br />
The supplier evaluation system will be in place starting 2011.<br />
The total volume of orders placed of DB Group during the<br />
year under review amounted to € 22.8 billion and was higher than<br />
previous year’s level (previous year: € 19.2 billion). In particular,<br />
the € 9.8 billion in freight and freight forwarding services purchased<br />
from carriers was significantly higher than in the previous<br />
year (previous year: € 7.3 billion). In addition, the volume of<br />
industrial products purchased, with an order volume of € 4.2 billion<br />
(previous year: € 3.5 billion), was also greater than in the previous<br />
year. Construction and engineering services procured totaled<br />
€ 3.8 billion (previous year: € 4.0 billion).<br />
The procurement of third-party services, with an order<br />
volume of € 2.7 billion, was also above the level noted in the<br />
previous year (previous year: € 2.3 billion). In the area of cableand-pipe-bound<br />
power and fuel, the order volume amounted to<br />
€ 2.3 billion, which was slightly higher than the previous year’s<br />
level (previous year: € 2.1 billion).<br />
27