Tobacco Permits: 2<br />

Room Inspection Permits: 2<br />

Swimming Pool/Hot Tub Permits: 6<br />

Stable Permits: 1<br />

Housing/Nuisance: 1<br />

Room Inspections: 6<br />

Food Service Inspections: 1<br />

Zoning Board <strong>of</strong> Appeals Comments: 6<br />

Tobacco Permit Inspections: 6<br />

Building Department Permit Reviews: 15<br />

COASTAL RESOURCES<br />

Project Planning/Coordination<br />

Old Mill Boat Yard Pier Reconfiguration- Met on-site with engineer and marine<br />

contractor to review potential construction methodologies. Begin preparation <strong>of</strong><br />

Seaport Bond grant application.<br />

<strong>Town</strong>-Wide Dredge permit- Further progress on revising plans as per DEP.<br />

Water Street Landing- Invasive Vegetation Removal- Attended ConsCom hearing<br />

and received approval for construction. Evaluated RFP submittals and selected<br />

contractor.<br />

Cotchpinicut and Cow Yard Landings Hazard Mitigation Grants- Responded to<br />

comments from DEP regarding their formal appeal <strong>of</strong> <strong>Town</strong>’s Order <strong>of</strong> Conditions<br />

due to designs <strong>of</strong> both projects. Attended MEPA on site for Cow Yard as well as<br />

DEP on-site to resolve DEP comments. Worked with the engineer to re-design<br />

projects to address DEP concerns.<br />

Ryder’s Cove/Marconi Park- Attended staff level meeting with <strong>Town</strong> Manager to<br />

review chronology and issues associated with current and past proposals for reuse<br />

<strong>of</strong> the “upper triangle.”<br />

South side beach nourishment: Finalized coordination for beach nourishment at<br />

Cockle Cove, Forest Beach and Pleasant Street Beach using stockpiled sand<br />

derived from construction <strong>of</strong> the wastewater facility. Work to commence in first<br />

part <strong>of</strong> February.<br />

Mitchell River Bridge: Attended consulting party conference call for the Sect 106<br />

process.<br />

Ongoing Administrative Activities<br />

ORV permits (1)<br />

Received and internally coordinated special use permit application. Forwarded to<br />

the BOS.<br />

Provide summary <strong>of</strong> departmental activities for 2011 Annual report.<br />

Departmental Coordination<br />

Continuing to provide technical comment, review and on site comment for the<br />

ConsCom regarding large shore protection project for Eastward Ho.<br />

Department Head Monthly Report to the <strong>Town</strong> Manager – January 2012 Page 11