Town of Chatham
Town Manager Report with DH Reports January ... - Town to Chatham
Town Manager Report with DH Reports January ... - Town to Chatham
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Tobacco Permits: 2<br />
Room Inspection Permits: 2<br />
Swimming Pool/Hot Tub Permits: 6<br />
Stable Permits: 1<br />
Housing/Nuisance: 1<br />
Room Inspections: 6<br />
Food Service Inspections: 1<br />
Zoning Board <strong>of</strong> Appeals Comments: 6<br />
Tobacco Permit Inspections: 6<br />
Building Department Permit Reviews: 15<br />
COASTAL RESOURCES<br />
Project Planning/Coordination<br />
Old Mill Boat Yard Pier Reconfiguration- Met on-site with engineer and marine<br />
contractor to review potential construction methodologies. Begin preparation <strong>of</strong><br />
Seaport Bond grant application.<br />
<strong>Town</strong>-Wide Dredge permit- Further progress on revising plans as per DEP.<br />
Water Street Landing- Invasive Vegetation Removal- Attended ConsCom hearing<br />
and received approval for construction. Evaluated RFP submittals and selected<br />
contractor.<br />
Cotchpinicut and Cow Yard Landings Hazard Mitigation Grants- Responded to<br />
comments from DEP regarding their formal appeal <strong>of</strong> <strong>Town</strong>’s Order <strong>of</strong> Conditions<br />
due to designs <strong>of</strong> both projects. Attended MEPA on site for Cow Yard as well as<br />
DEP on-site to resolve DEP comments. Worked with the engineer to re-design<br />
projects to address DEP concerns.<br />
Ryder’s Cove/Marconi Park- Attended staff level meeting with <strong>Town</strong> Manager to<br />
review chronology and issues associated with current and past proposals for reuse<br />
<strong>of</strong> the “upper triangle.”<br />
South side beach nourishment: Finalized coordination for beach nourishment at<br />
Cockle Cove, Forest Beach and Pleasant Street Beach using stockpiled sand<br />
derived from construction <strong>of</strong> the wastewater facility. Work to commence in first<br />
part <strong>of</strong> February.<br />
Mitchell River Bridge: Attended consulting party conference call for the Sect 106<br />
process.<br />
Ongoing Administrative Activities<br />
ORV permits (1)<br />
Received and internally coordinated special use permit application. Forwarded to<br />
the BOS.<br />
Provide summary <strong>of</strong> departmental activities for 2011 Annual report.<br />
Departmental Coordination<br />
Continuing to provide technical comment, review and on site comment for the<br />
ConsCom regarding large shore protection project for Eastward Ho.<br />
Department Head Monthly Report to the <strong>Town</strong> Manager – January 2012 Page 11