Town of Chatham
Town Manager Report with DH Reports January ... - Town to Chatham
Town Manager Report with DH Reports January ... - Town to Chatham
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Town</strong> <strong>of</strong> <strong>Chatham</strong><br />
Department <strong>of</strong> Public Works<br />
Highway Division<br />
<br />
<br />
<br />
<br />
<br />
<br />
Trucked 600 yards <strong>of</strong> road sweeping from Transfer Station to low area between<br />
Transfer Station and Treatment Plant and spread over low area, and re-graded<br />
the road leading into the pit.<br />
Built 6 new road barricades and primed and painted.<br />
Went out twice and sanded the main, secondary roads, parking lots, and we<br />
plowed once Main roads, secondary roads, some dirt roads, parking lots and<br />
sidewalks. We also plowed the runway at <strong>Chatham</strong> Airport. Checked out all<br />
sanders and trucks after sanding and plowing. Made some repairs to both sanders<br />
and snowplows.<br />
We continued to clean out catch basins with catch basin digger. Repaired three<br />
catch basin frames were settling, bricks or blocks were broken and missing.<br />
We picked trash along the side <strong>of</strong> roads, parking lots, town landings and in<br />
wooded areas where there is illegal dumping <strong>of</strong> furniture, rugs, washing<br />
machines.<br />
Assisted with the parking lot lights (behind the former CVS) planning for the<br />
conduit installation.<br />
Department Head Monthly Report to the <strong>Town</strong> Manager – January 2012 Page 61