Attended court arraignment on non-criminal disposition for non-payment <strong>of</strong><br />
violation penalty for Shellfishing without Permit (Sec. 301, Par. A). Hearing<br />
scheduled for February 9, 2012.<br />
Meetings with staff, Selectman Tim Roper and FWS Dave Brownlie concerning<br />
hydraulic pumping in the Powder Hole.<br />
Cleaned grow-out nets in Stetson’s Cove.<br />
As staff liaison to the Shellfish Advisory Committee, the Shellfish Department acted<br />
on the following directives:<br />
Met with other <strong>Town</strong> department staff to examine possible use <strong>of</strong> chase boats to<br />
deter eider duck predation on mussel beds.<br />
Requested the opening <strong>of</strong> commercial harvesting <strong>of</strong> scallops on Sundays before<br />
the BOS.<br />
Collaborated with the Harbormaster’s Office to test Ultra Sonic Bird X Repeller to<br />
determine if effective in dispersing Eider Duck flocks.<br />
WATER QUALITY LABORATORY<br />
<br />
Continued relocation/setup <strong>of</strong> laboratory facilities into new laboratory in<br />
wastewater treatment facility Operations Building<br />
STICKER (PERMT) OFFICE<br />
The Sticker Office is closed for the season with Beach, Transfer Station, and Recycle<br />
Stickers and Shellfish Licenses available in the Health & Environment Dept., placing<br />
additional responsibilities on existing H&E staff. Stickers and licenses are available<br />
Monday to Friday from 9 AM to Noon.<br />
During January the following stickers/licenses were sold:<br />
New Recycle Sticker – 8<br />
New Transfer Station Sticker – 10<br />
New Combo Sticker – 0<br />
New Shellfish - 4<br />
Replacement Recycle – 1<br />
Replacement Transfer Station – 12<br />
Replacement Combo – 10<br />
Replacement Shellfish - 1<br />
WASTEWATER PROJECT<br />
<br />
<br />
<br />
<br />
<br />
<br />
Bi-Weekly Wastewater Treatment Plant construction progress meetings<br />
Weekly Wastewater Treatment Plant startup meetings<br />
Sewer construction progress/coordination meetings<br />
Wastewater pump station progress/coordination meetings<br />
Multiple site visits to wastewater treatment plant construction site and pump<br />
station construction sites<br />
Meeting with Engineer, Operations Personnel and town GIS Coordinator to<br />
review preparation <strong>of</strong> Record Drawings and integration into towns GIS system<br />
Department Head Monthly Report to the <strong>Town</strong> Manager – January 2012 Page 13