18.02.2016 Views

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

118<br />

<strong>API</strong> 653 Initial Inspection Interval<br />

Tank Safeguard<br />

Fiberglass-reinforced lining of the product-side of the tank bottom installed per <strong>API</strong> 652.<br />

Add to Initial Interval<br />

5 yrs<br />

Installation of an internal thin-film coating as installed per <strong>API</strong> 652.<br />

2 yrs<br />

Cathodic protection of the soil-side of the tank bottom installed, maintained and<br />

inspected per <strong>API</strong> 651.<br />

5 yrs<br />

Release prevention barrier installed per <strong>API</strong> 650, Annex I.<br />

10 yrs<br />

Bottom corrosion allowance greater than 0.150 in.<br />

(Actual corrosion allowance - 150 mils) / 15<br />

mpy

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!