18.02.2016 Views

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Q13. In re-erecting a tank shell, what length "sweep-board" and what are<br />

maximum allowable values for weld seam peaking?<br />

a. 0.50" (1/2") with 36" horizontal sweep board?<br />

b. 0.25" (1/4") on verticals; 0.50" (1/2") on horizontal with 36" board<br />

c. 0.75" (3/4") with 48" board.<br />

d. 1.00" (1") with 48" board.<br />

ANS: A<br />

Q14. Welding procedure Specs (WPS) are established in Section 11 of <strong>API</strong>-<br />

653. Welders/operators must be qualified in accordance with which of the<br />

codes listed, if the weld is a new shell to nozzle weld.<br />

a. AWS<br />

b. Section V ASME<br />

c. Section VIII ASME<br />

d. Section IX ASME<br />

ANS: D<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!