18.02.2016 Views

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12.1.2 Shell Penetrations<br />

12.1.2.1 UT lamination check required for:<br />

a. Adding reinforcement plate to an unreinforced penetration.<br />

b. Installing a hot-tap connection.<br />

12.1.2.2 Cavities from gouging or grinding to remove reinforcement<br />

pad welds require either a magnetic particle or liquid penetrant test.<br />

12.1.2.3 Completed welds attaching nozzle to shell or pad to shell and nozzle<br />

neck shall be examined by a magnetic particle or liquid penetrate test.<br />

Consideration should be given for extra NDE on hot taps.<br />

12.1.2.4 Complete welds in stress relieved components require magnetic<br />

particle or liquid penetrate testing (after stress relief, but before hydrostatic<br />

test).<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!