<strong>API</strong>651: 11.3.2 Inspection, Testing, and Maintenance of Cathodic<br />
Protection Facilities<br />
11.3.2.1 Inspection and tests of cathodic protection facilities should be made<br />
to ensure their proper operation and maintenance.<br />
11.3.2.2 All sources of impressed current should be checked at intervals not<br />
exceeding two months unless specified otherwise by regulation. Evidence of<br />
proper function may be current output, normal power consumption, a signal<br />
indicating normal operation, or satisfactory electrical state of the protected<br />
structure. A satisfactory comparison between the rectifier operation on a<br />
bimonthly basis and the rectifier operation during the annual survey implies<br />
the protected status of affected structures is similar. This does not take into<br />
account possible effects of foreign current sources.<br />
11.3.2.3 All impressed current protective facilities should be inspected<br />
annually as part of a preventive maintenance program to minimize in-service<br />
failure. Inspections should include a check of the general condition, including<br />
electrical shorts, ground connections, rectifier meter accuracy, efficiency, and<br />
circuit resistance.<br />
11.3.2.4 The effectiveness of isolating devices and continuity bonds should<br />
be evaluated during the periodic surveys. This can be accomplished by onsite<br />
inspection or by evaluating cathodic protection test data.<br />