18.02.2016 Views

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

Understanding API ICP653 Reading 7-Worksheet-04 Part1

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Q9. Which of the areas described below are considered to be the<br />

"critical zone" involving tank bottom repair?<br />

a. Within the annular ring, within 12" of shell, or within 12" of inside edge of<br />

annular plate ring.<br />

b. Any area where 3–plate laps are located<br />

c. Within 36" (measured vertically) from any shell penetration above.<br />

d. Within 3" from the shell on the bottom plates<br />

ANS: D<br />

Q10. Select the minimum number of "t" measurements required (along the<br />

circumference of any proposed "hot-tap" nozzle location):<br />

a. One (1) on horizontal centerline (3" from edge) on each side of proposed<br />

shell opening cut.<br />

b. Four (4)<br />

c. Eight (8)<br />

d. Establishment of both a minimum and average "t" over the entire<br />

nozzle installation area.<br />

ANS: B<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!