9.14.5 Installation Procedure<br />

9.14.5.1 Pre-cut pipe nozzle to shell contour and outside bevel for full<br />

penetration weld. (See Fig. 9-6, page 9-12 for details).<br />

9.14.5.2 After pipe nozzle is welded, install the reinforcement (1 piece or 2<br />

pieces). A two piece pad requires a horizontal weld).<br />

NOTES:<br />

1. Full penetration weld - pad to nozzle.<br />

2. Limit weld heat input as practical.<br />

9.14.5.3 Upon weld completion:<br />

a. Conduct NDE as required by procedure.<br />

b. Pneumatically test per <strong>API</strong>-650 procedure.<br />

c. After valve installation, pressure test (at least 1.5 times the hydrostatic<br />

head) the nozzle prior to mounting the hot-tap machine.<br />

9.14.5.4 Following the hot-tap machine manufacturer's procedure,<br />

only qualified operators can make the shell cut.<br />