22.09.2016 Views

Roadside Revegetation

RoadsideReveg_PollinatorHabitat_DRAFTv1-1_sept2016

RoadsideReveg_PollinatorHabitat_DRAFTv1-1_sept2016

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REVEGETATION PLAN EXAMPLE<br />

SUCCESS CRITERIA<br />

Success Criteria<br />

TABLE 8. CRITERIA UPON WHICH NATIVE AND NON-NATIVE PLANT SUCCESS WILL BE MEASURED.<br />

Item Benchmark Timeframe Notes<br />

Noxious weed control ≤ 20% cover By year 3 Oregon Noxious Weed List A and B<br />

Noxious weed control ≤ 10% cover By year 5 Oregon Noxious Weed List A and B<br />

Planting density<br />

≥ 400 woody stems per By year 5<br />

acre<br />

Native plant percent cover ≥ 20% cover By year 1<br />

Native plant percent cover ≥ 40% cover By year 3<br />

Native plant percent cover ≥ 80% cover By year 5<br />

Native plant diversity ≥ 5 woody species<br />

comprise ≥ 5% total cover<br />

By year 5<br />

If performance standards<br />

not met<br />

Use of adaptive<br />

management practices<br />

As early as detected<br />

May include replanting, reseeding,<br />

noxious weed removal,<br />

improvement of soil quality,<br />

irrigation, mulch.<br />

Page 24<br />

Historic Columbia River Highway State Trail, Segments A-C Final <strong>Revegetation</strong> Plan<br />

<strong>Roadside</strong> <strong>Revegetation</strong>: An Integrated Approach to Establishing Native Plants and Pollinator Habitat<br />

185

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!