DoDI 5000.02, January 7, 2015<br />

(e) Model 4: Accelerated Acquisition Program. Figure 6 is a model that applies<br />

when schedule considerations dominate over cost and technical risk considerations. This model<br />

compresses or eliminates phases <strong>of</strong> the process and accepts the potential for inefficiencies in<br />

order to achieve a deployed capability on a compressed schedule. The model shows one<br />

example <strong>of</strong> tailoring for accelerated acquisition and many others are possible. This type <strong>of</strong><br />

structure is used when technological surprise by a potential adversary necessitates a higher-risk<br />

acquisition program. Procedures applicable to urgent needs that can be fulfilled in less than 2<br />

years are a subset <strong>of</strong> this model and are discussed in Enclosure 13.<br />

Figure 6. Model 4: Accelerated Acquisition Program<br />

Materiel<br />

Development<br />

Decision<br />

Preliminary<br />

Design<br />

Review<br />

IOC<br />

FOC<br />

A/B<br />

C<br />

OT&E<br />

Sustainment<br />

Disposal<br />

Materiel<br />

Solution<br />

Analysis<br />

Concurrent Technology<br />

Maturation, Risk Reduction<br />

and Development<br />

Concurrent<br />

Production and<br />

Deployment<br />

Operations & Support<br />

Legend:<br />

= Milestone Decision = Decision Point<br />

Change 2, 02/02/2017 15