14.12.2012 Views

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BPA <strong>McNary</strong>-<strong>John</strong> <strong>Day</strong> <strong>Transmission</strong> <strong>Project</strong><br />

<strong>Draft</strong> <strong>EIS</strong><br />

February 2002<br />

Printed References<br />

Kidd, R.S. 1965. The Alderdale Archaeological <strong>Project</strong>, Final Report. Seattle, WA:<br />

University of Washington. Department of Anthropology.<br />

Klickitat County, Washington. 1979. Comprehensive Plan, August 1977 (amended<br />

April 1979). Goldendale, WA: Klickitat County Planning and Community Affairs<br />

Agency.<br />

. 2001. Klickitat County Critical Areas Ordinance. Klickitat County, WA.<br />

Lautz, K., 2000. Salmon and steelhead habitat limiting factors, Water Resource<br />

Inventory Area 31. Washington State Conservation Commission.<br />

Lee, J.M. Jr. 1978. Effects of transmission lines on bird flights: studies of Bonneville<br />

Power Administration lines. Pages 93-116 in Avery, M.L. (ed.) Impacts of<br />

transmission lines on birds in flight. Proceedings from a Conference, Oak Ridge, TN:<br />

OakRidge Associated Universities.<br />

Leonard, W.P., H.A. Brown, L.L.C. Jones, K.R. McAllister, and R.M. Storm. 1993.<br />

Amphibians of Washington and Oregon. Seattle Audubon Society Trailside Series.<br />

Lewarch, D. 1996. Cultural Resource Assessment of the Proposed Regional Disposal<br />

Company Airstrip, West Roosevelt, Klickitat County, Washington. Seattle, WA:<br />

Larson Anthropological Archaeological Services.<br />

Lewarch, D. and L. Larson. 1991. Cultural Resources Assessment of the Rebanco<br />

Regional Landfill Company Intermodal Transfer Facility <strong>Project</strong>, Klickitat County,<br />

Washington. LAAS Technical Report 91-13. Seattle, WA: Larson Anthropological<br />

Archaeological Services.<br />

Ludwa, K.A., and K.O. Richter. 2000. Emergent macroinvertebrate communities in<br />

relation to watershed development. Page 263 in A.L. Azous and R.R. Horner, eds,<br />

Wetlands and urbanization-implications for the future. Boca Raton, FL: CRC Press.<br />

Malcolm, J.M. 1982. Bird collisions with a power transmission line and their relation to<br />

botulism in a Montana wetland. Wildlife Society Bulletin 10:297-304.<br />

Matsen, Ruth A. 1986. A Cultural Resources Survey of Two Tower Relocation Areas<br />

Within the Bonneville Power Administration’s <strong>McNary</strong>-Big Eddy <strong>Transmission</strong> <strong>Line</strong><br />

Corridor, Klickitat County, Washington. Archaeological and Historical Services.<br />

Short Report Number SR-114. Cheney, WA: Eastern Washington University.<br />

McAllister, K.R., W.P. Leonard, D.W. Hays, and R.C. Friesz. 1999. Washington state<br />

status report for the northern leopard frog. Washington Department of Fish and<br />

Wildlife. Olympia, WA.<br />

McNeil, R., S.J.R. Rodriguez, and H. Ouelett. 1985. Bird mortality at a power<br />

transmission line in northeastern Venezuala. Biological Conservation 31:153-165.<br />

5-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!