Figure 1, continued<br />

Bonneville Power Administration/<strong>McNary</strong> – <strong>John</strong> <strong>Day</strong> 500-kV <strong>Transmission</strong>-line <strong>Project</strong><br />

Tables: Electrical Effects<br />

e) Proposed line on existing Hanford – <strong>John</strong> <strong>Day</strong> 500-kV towers with parallel 230-kV, 345-kV, and 500-kV lines (Configuration 4A)<br />

(not to scale)<br />

Average 36.5'<br />

Minimum 26.5'<br />

SOUTH<br />

EDGE<br />

OF<br />

ROW<br />

Existing BPA Horse Heaven-<br />

Harvalum No. 1 230-kV <strong>Line</strong><br />

62.5'<br />

B A C<br />

26.33'<br />

Average 44'<br />

Minimum 34'<br />

125'<br />

Existing BPA <strong>McNary</strong>-<br />

Ross No. 1 345-kV <strong>Line</strong><br />

B A C<br />

32'<br />

27.5'<br />

Average 43'<br />

Minimum 33'<br />

125'<br />

Proposed BPA 500-kV <strong>Line</strong><br />

(on existing tower)<br />

C<br />

B<br />

A<br />

40'<br />

Average 45'<br />

Minimum 35'<br />

200'<br />

Existing BPA Hanford-<br />

<strong>John</strong> <strong>Day</strong> 500-kV <strong>Line</strong><br />

(on new tower)<br />

B<br />

C A<br />

48'<br />

75'<br />

34.5'<br />

NORTH<br />

EDGE<br />

OF<br />

ROW<br />

49