07/30/01<br />

slmason<br />

MCNARY-JOHN DAY TRANSMISSION LINE PROJECT - SCOPING COMMENTS<br />

Notes:<br />

Mtg1 = comments made at 5/23/01 public meeting at Paterson School, Paterson, WA<br />

Mtg2 = comments made at 5/24/01 public meeting at Roosevelt School, Roosevelt, WA<br />

E-M = commenter sent e-mail<br />

Phone = commenter phoned<br />

Letter = comments made through letter to BPA<br />

Form = commenter used BPA form<br />

PEP = comments written on Permission to Enter Property form<br />

How Chap Topic Comments<br />

Comment Topics that fall into Chapter 1 of <strong>EIS</strong><br />

(Purpose of and Need for Action)<br />

Mtg2 1 Background Power producers don't want to connect to the 500 line. It is too expensive.<br />

Letter 1 Background I need more information about why you oversold our power, made commitments that you<br />

could not keep.<br />

Mtg1 1 Background How will this affect rates?<br />

Mtg1 1 Background Where is funding coming from?<br />

Mtg2 1 Background The existing line is at capacity; does that include Calpine-Goldendale?<br />

1 Decision Has a decision been made?<br />

Mtg1 1 Need What is the need for the third line?<br />

Mtg1 1 Need Is the power going to California?<br />

Mtg1 1 Need How will the grid system work? Who is it serving?<br />

Mtg1 1 Need Is the Cogentrix Plant/Mercer Ranch impacting the need for this project?<br />

Mtg1 1 Need How about the gas-fired plants in Hermiston? How do they affect this project?<br />