14.12.2012 Views

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bonneville Power Administration/<strong>McNary</strong> – <strong>John</strong> <strong>Day</strong> 500-kV <strong>Transmission</strong>-line <strong>Project</strong><br />

Tables: Electrical Effects<br />

Figure 2, continued<br />

f) Proposed line with parallel 230-kV, 345-kV, and 500-kV lines (Configuration 4B, 275-ft.<br />

spacing)<br />

54<br />

ELECTRIC FIELD, kV/m<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

Proposed BPA 500-kV line<br />

550 kV max.<br />

SOUTH<br />

EDGE<br />

OF<br />

ROW<br />

NORTH<br />

EDGE<br />

OF<br />

ROW<br />

Highway<br />

14<br />

Existing BPA 230-kV line<br />

242 kV max.<br />

SOUTH<br />

EDGE<br />

OF<br />

ROW<br />

Existing BPA 345-kV line<br />

362 kV max.<br />

0<br />

-100 -50 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800<br />

DISTANCE FROM CENTERLINE OF PROPOSED LINE, feet<br />

Existing BPA 500-kV line<br />

550 kV max.<br />

NORTH<br />

EDGE OF ROW<br />

Proposed<br />

Existing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!