14.12.2012 Views

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bonneville Power Administration/<strong>McNary</strong> – <strong>John</strong> <strong>Day</strong> 500-kV <strong>Transmission</strong>-line <strong>Project</strong><br />

Tables: Electrical Effects<br />

Figure 1: Configurations for the proposed <strong>McNary</strong> – <strong>John</strong> <strong>Day</strong> 500-kV line: a) Proposed line with parallel 230-kV and<br />

345-kV lines (Configuration 1); b) Proposed line with parallel 230-kV, 345-kV, and double-circuit 500-kV lines<br />

(Configuration 2); c) Proposed line with no parallel lines (Configuration 3); d) Proposed line with parallel 230kV,<br />

345-kV, and 500-kV lines (Configurations 4 and 4B); and e) Proposed line on existing Hanford – <strong>John</strong> <strong>Day</strong><br />

500-kV line towers with parallel 230-kV, 345-kV, and 500-kV lines (Configuration 4A). (5 pages)<br />

a) Proposed line with parallel 230-kV and 345-kV lines (Configuration 1) (not to scale)<br />

SOUTH<br />

EDGE OF ROW<br />

Average 36.5'<br />

Minimum 26.5'<br />

Existing BPA <strong>McNary</strong>-<br />

Horse Heaven 230-kV <strong>Line</strong><br />

62.5'<br />

C B A<br />

26.33'<br />

Average 44'<br />

Minimum 34'<br />

125'<br />

Existing BPA <strong>McNary</strong>-<br />

Ross No. 1 345-kV <strong>Line</strong><br />

A C B<br />

32'<br />

Average 45'<br />

Minimum 35'<br />

125'<br />

Proposed<br />

BPA 500-kV <strong>Line</strong><br />

B<br />

C A<br />

48'<br />

187.5'<br />

34.5'<br />

NORTH<br />

EDGE OF ROW<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!