Form 3 Water If your project needs water for construction purposes, you may need a limited license. For<br />

information, please contact Vern Church 541-384-4207.<br />

Mtg2 3 Water <strong>McNary</strong>-Ross, 69/4 to aluminum plant is leased for pasture; there are a lot of springs in this<br />

area. Not used for pasture January through March, generally.<br />

Mtg1 3 Wildlife Wildlife mitigation is needed along route.<br />

Mtg1 3 Wildlife Deer migration needs to be considered, drainages.<br />

Mtg1 3 Wildlife The north-south migration corridor for water fowl runs entire length of project route.<br />

Mtg1 3 Wildlife Mitigation needed for mortality of raptors, for entire 75 miles.<br />

07/30/01<br />

slmason<br />

25