01.05.2018 Views

BISICHI MINING PLC ANNUAL REPORT 2017

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STRATEGIC <strong>REPORT</strong> FINANCIAL & PERFORMANCE REVIEW<br />

South African mining operations<br />

Performance<br />

The key performance indicators of the group’s South African mining<br />

operations are presented in South African Rand and UK Sterling as follows:<br />

South African Rand<br />

<strong>2017</strong><br />

R’000<br />

2016<br />

R’000<br />

<strong>2017</strong><br />

£’000<br />

UK Sterling<br />

Revenue 622,691 432,481 36,300 21,703<br />

Mining and washing costs (440,241) (322,505) (25,664) (16,184)<br />

Operating profit before other operating costs and depreciation 182,450 109,976 10,636 5,519<br />

Other operating costs (excluding depreciation) (5,742) (4,764)<br />

Operating profit before depreciation, fair value adjustments and exchange<br />

4,894 755<br />

movements (adjusted EBITDA)<br />

Exchange movements (256) 449<br />

Share of loss in joint ventures (1,827) -<br />

EBITDA 2,811 1,204<br />

Mining production in tonnes 1,296 1,260<br />

Revenue per tonne of mining production 480 343<br />

Mining and washing costs per tonne of mining production (340) (256)<br />

Operating profit per tonne of mining production before other operating costs and depreciation 140 87<br />

A breakdown of the quantity of coal sold and revenue of the group’s South African mining operations are presented in metric tonnes and South<br />

African Rand as follows:<br />

Domestic<br />

‘000<br />

Export<br />

‘000<br />

<strong>2017</strong><br />

‘000<br />

Domestic<br />

‘000<br />

Export<br />

‘000<br />

2016<br />

‘000<br />

Quantity of coal sold in tonnes 1,267 155 1,422 1,219 147 1,366<br />

Domestic<br />

R’000<br />

Export<br />

R’000<br />

<strong>2017</strong><br />

R’000<br />

Domestic<br />

R’000<br />

Total Revenue 502,818 119,873 622,691 339,611 92,870 432,481<br />

R R R R R R<br />

Revenue per tonne of coal sold 397 773 438 279 632 317<br />

The quantity of coal sold can be defined as the quantity of coal sold in metric tonnes from the mine in any given period. Revenue per tonne of coal<br />

sold can be defined as the net revenue price achieved per metric tonne of coal sold.<br />

Total revenue for the group’s mining operations increased for the year from R317 per tonne of coal sold in 2016 to R438 in <strong>2017</strong>, attributable to the<br />

average price increases achieved in both the domestic and export market. As a result of the overall higher mining production, the quantity of coal sold<br />

for the year increased to 1.422million tonnes (2016: 1.366million tonnes). Overall, the revenue for the group’s South African mining operations<br />

increased in the year to R622.7million (2016: R432.5 million).<br />

The overall increase in cost per tonne from R256 per tonne to R340 per tonne can mainly be attributed to the movement of mining operations to new<br />

opencast reserves at Black Wattle which have higher inherent mining costs. As a result of the higher mining cost per tonne and the increase in total<br />

mining production, total mining and washing costs for the group increased from R322.5million in 2016 to R440.2million in <strong>2017</strong>.<br />

Other operating costs (excluding depreciation) of £5.7million (2016: £4.8million) include general administrative costs as well as administrative salaries<br />

and wages related to our South African mining operations that are incurred both in South Africa and in the UK. These costs are not significantly<br />

impacted by movements in mining production and the increase during the year can mainly be attributed to exchange movements on the translation of<br />

South African Rand costs into Sterling. Overall costs were in line with management’s expectations and local inflation.<br />

Bisichi Mining <strong>PLC</strong> 21<br />

<strong>2017</strong><br />

‘000<br />

<strong>2017</strong><br />

R<br />

Export<br />

R’000<br />

2016<br />

£’000<br />

2016<br />

‘000<br />

2016<br />

R<br />

2016<br />

R’000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!