Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />

Technical - Inspection<br />

Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />

Technical - Inspection<br />

S NO FROM TO PIPE LINE NO.<br />

11<br />

17-C-43 to 17-C-44<br />

piping<br />

12 17-GM-01 Disch.<br />

17-C-44 to storage<br />

piping<br />

ORIGINAL<br />

THICK<br />

mm<br />

MIN. THICK<br />

mm<br />

6"-P-17-410-A1A 7.1 4.7<br />

17-D-42 (Caustic 1 1/2"-GC-17-205-A9A<br />

Storage )Tank / 3"-GC-17-425-A9A<br />

REMARKS<br />

Dropped/ Next<br />

opportunity<br />

IWL:9910-017-005-<br />

<strong>2018</strong><br />

5.1 / 5.5 5.3 / 5.2 OK<br />

13 17-C-02 PSV-01 FLARE HEADER 2"/3"-17-FL-201-A1A 5.5/5.5 4.2/4.5 OK<br />

2.5.2.6 PIPING GAUGING AT PLANT-17 (Uninsulated Piping)<br />

S NO FROM TO PIPE LINE NO.<br />

ORIGINAL<br />

THICK<br />

mm<br />

MIN.<br />

THICK<br />

mm<br />

1 17-C-22 17-GM-21A/B 3/4"GI-17-106-A9A 3.9 Nil<br />

2<br />

3<br />

4<br />

5<br />

17-C-20A/B Bot.<br />

piping<br />

17-C-20A/B Bot.<br />

piping<br />

17-C-20A/B Bot.<br />

piping<br />

17-E-20 Shell<br />

Outlet<br />

17-GM-21A/B<br />

piping<br />

4"-P-17-105-A9A-<br />

Is<br />

REMARKS<br />

Hammer tested<br />

& Visually<br />

checked found<br />

Ok<br />

6.0 5.6 OK<br />

17-GM-20 Suc. 4"-P-17-108-A9A 6.0 5.4 OK<br />

17-E-20 Shell<br />

Inlet<br />

6 17-C-20A 17-C-20B<br />

7 17-C-20A/B Drain 17-C-21 Pot<br />

8 17-C-02 Top 17-C-03 Tray 1<br />

3"-P-17-121-<br />

A9A/A1A-Is<br />

5.5 4.5<br />

17-D-20 3"-P-17-122-A1A 5.5 3.0<br />

1"-P-17-128/127-<br />

A9A/2"-P17-113-<br />

A9A, 2"-P17-117-<br />

A1A<br />

1"-P-17-115/116-<br />

A9A<br />

3"/2"-P-17-204-<br />

B7A<br />

3" P&ID but 4”<br />

in field<br />

IWLNo:9910-<br />

017-002-<strong>2018</strong><br />

Not replaced,<br />

redundant Line<br />

4.6/5.5 5.7/- OK<br />

4.6 6.5 OK<br />

5.5/5.5 6.2/4.3 OK<br />

9 17-C-03 top 17-C-04 top 3"-P-17-206-B7A 5.5 4.6 OK<br />

10 17-C-11 17-C-12 2"-P-17-304-B7A 5.5 4.7 OK<br />

11 17-C-04 17-C-05Top 3"-P-17-209-B7A 5.5 4.8 OK<br />

12<br />

17-C-04 to 17-C-<br />

05 piping<br />

17-C-05 to 17-<br />

C-02 piping<br />

3"-P-17-210-B7A 5.5 6.5 OK<br />

13 17-C-07 17-C-08 Top 2"-P-17-216-A9A 5.5 5.3 OK<br />

S NO FROM TO PIPE LINE NO.<br />

14 17-C-41 bottom<br />

15 17-C-40 drain<br />

16 17-C-41 bottom<br />

17 17-C-44 bottom<br />

18<br />

17-GM-42/43<br />

disch.<br />

17-GM-42/43<br />

suction<br />

17-GM-42/43<br />

suction piping<br />

17-GM-42/43<br />

suction<br />

17-GM-42/43<br />

suction<br />

ORIGINAL<br />

THICK<br />

mm<br />

MIN.<br />

THICK<br />

mm<br />

REMARKS<br />

3"-P-17-422-A9A 5.5 4.4 OK<br />

3"-P-17-422-A9A 5.5 3.9<br />

Replacement to<br />

be done in next<br />

opportunity<br />

3"-P-17-417-A1A 5.5 4.4 OK<br />

3"-P-17-414-A1A 5.5 4.4 OK<br />

17-C-40 6"-P-17-435-A9A 7.1 5.6 OK<br />

19 17-C-40 Bot. 17-C-41 Top 6"-P-17-404-A9A 7.1 5.3 OK<br />

20 17-C-41 Top. 17-C-42 Bot. 6"-P-17-405-A1A 7.1 5.8 OK<br />

21 17-C-42 Top. 17-C-43 Bot.<br />

22 17-C-43 Top. 17-C-44 top<br />

23<br />

17-C-10 bottom<br />

pump out<br />

24 17-C-08 top<br />

25<br />

17-GM-02A/B<br />

disch.<br />

26 17-C-07 bottom<br />

17-GM-02A/B<br />

suction piping<br />

17-GM-02A/B<br />

suction<br />

17-C-10<br />

17-GM-03A/B<br />

suction piping<br />

6"-P-17-407/408-<br />

A1A<br />

6"-P-17-407/408-<br />

A1A<br />

1"-P-17-227-<br />

A1A,2"-P17-226-<br />

A1A<br />

1"-P-17-219-<br />

A1A,1"-P-17-220-<br />

A1A<br />

1"-P-17-222-<br />

A1A,1-P-17-221-<br />

A1A<br />

7.1 5.8<br />

7.1 4.7<br />

4.6 / 5.5 4.2/3.2<br />

Dropped/Next<br />

opportunity IWL<br />

No:9910-017-<br />

005-<strong>2018</strong><br />

Replacement to<br />

be done in next<br />

opportunity<br />

4.6 4.4 OK<br />

4.6 4.1 OK<br />

1"-P-17-210-A9A 4.6 5.3 OK<br />

27 17-C-08 top 17-C-09 1"-P-17-229-A1A 4.6 3.1<br />

Replacement to<br />

be done in next<br />

opportunity<br />

28 Kerosene from CDU 17-A-40 6"-P-15-380-B1A 7.1 5.9 OK<br />

29 17-A-40<br />

30 17-C-01 Bot.<br />

17-Y-41 (Air<br />

Mixer)<br />

17-GM-01<br />

Suction<br />

31 17-C-02 Bottom 17-C-01<br />

32 17-C-03 bottom<br />

33 17-C-04 bottom<br />

34 17-C-05 bottom<br />

35 17-C-06 bottom<br />

Rich Caustic<br />

header<br />

Rich Caustic<br />

header<br />

Rich Caustic<br />

header<br />

Rich Caustic<br />

header<br />

6"-P-15-402-A9A 7.1 5.5 OK<br />

2"-GC-17-204-A9A 5.5 4.2 OK<br />

2"/1" -GC-17-<br />

203/201-A9A<br />

1-1/2"-GC-206-<br />

B7A/A9A<br />

1-GC-207/207-1-<br />

B7A/A9A<br />

1-GC-208-<br />

B7A/A9A, 2"-P17-<br />

213-B7A<br />

1-GC-215-<br />

B7A,1.5"-GC-206-<br />

5.5/4.6 5.0/- OK<br />

5.1 4.4 OK<br />

4.6 5.0 OK<br />

4.6 / 5.5 5.3/4.7 OK<br />

4.6 / 5.1 4.7/7.2 OK<br />

CRUDE DISTILLATION UNIT<br />

(CDU/ VDU-<strong>II</strong> PLANT-15, 17, 18)<br />

292<br />

<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />

<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />

293

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!