Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />

Technical - Inspection<br />

Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />

Technical - Inspection<br />

There was delay, quality issues observed in erecting scaffolding for hot pipelines along with insulation<br />

removal during the shutdown outage and this led to delay in thickness gauging. In spite of repeated attempts<br />

to improve scaffolding completion, thickness gauging at some point during 30 th day of shutdown had to be<br />

stopped. In total, thickness gauging of 36 % of hot pipelines was completed.<br />

However, there were very few surprises on hot pipeline gauging which were recommended for replacement.<br />

Around 80% of modification drawings were taken up and executed. Balance could not be taken up due to<br />

resource constraints and paucity of time.<br />

Major structural staircase for CDU-<strong>II</strong> – Atmospheric column at top 6.0 mt elevation was already pre-fabricated<br />

& same was erected at site by project.<br />

Most of the structural work replacement planned earlier was executed during the shutdown except platform<br />

replacement in the debutanizer columns near FCCU New Gas con. area.<br />

Bench testing of 210 nos. of PSV/TSVs was completed against 373 nos. and 72 nos. of PSV/TSVs were not<br />

taken up/ not released. Around 91 TSV’s / PSV’s found to be missing at site and action to be initiated for<br />

procurement.<br />

1.6.1.5 FLARE SYSTEM:<br />

Consolidated list of PSV/TSV bench testing executed..Unit wise<br />

There was no scope variation on Planned vs Actual wrt. Flare system and all jobs as planned were executed.<br />

However, flare derrick structurals reinforcement including replacement of ladder & platforms and painting of<br />

flare structures were done partially due to paucity of time.<br />

1.6.2 Contractor Performance & Quality Of Work<br />

1.6.2.1 MAJOR CONTRACTOR LIST<br />

Units Job Scope Contractor<br />

FCCU - RR CIRCUIT, HEATER (16-F-01), CO BOILER & CO-STACK<br />

16<br />

Mech. & Refrac. Jobs - R-R Circuit, 16-F-01, COB<br />

Refractory - CO Stack<br />

Structural Jobs<br />

HEATERS (CDU-2, WAX), PIPING (CDU-2)<br />

M/s L&T Heavy Engineering Division<br />

Civil - M/s Industrial Associates Ltd.<br />

M/s St. Antony Engg.<br />

14<br />

Mech. jobs- 14-F-01 & 14-F-101<br />

M/s Logos Engginering Pvt. Ltd.<br />

Refractory - 14-F-01 & 14-F-101<br />

Civil - M/s Lizamontagens Pvt. Ltd.<br />

Mech. & Refrac. jobs- 15-F-01A, 15-F-02A<br />

M/s L&T Heavy Engineering Division<br />

15<br />

Heaters - 15-F-01B & 15-F-02B<br />

M/s Excellent Projects India Pvt. Ltd.<br />

Refractory - 15-F-01B & 15-F-02B<br />

Civil - M/s Lizamontagens Pvt. Ltd.<br />

Piping - Replacement & Modification<br />

M/s Shilpi Engg. Ltd<br />

17 & 18 Piping - Replacement & Modification M/s Shilpi Engg. Ltd<br />

COLUMNS & VESSELS (All Units)<br />

14 Vessels M/s Logos Engginering Pvt. Ltd.<br />

15 VDU Top dome replacement M/s L&T Heavy Engineering Division<br />

15, 17 & 18 Vessels M/s Excellent Projects India Pvt. Ltd.<br />

16 & 19 Vessels M/s Shilpi Engg.<br />

HEAT EXCHANGERS (All Units)<br />

14 Exchangers M/s Logos Engginering Pvt. Ltd.<br />

15 15-E-43 M/s L&T Heavy Engineering Division<br />

15, 17 & 18 Exchangers M/s Excellent Projects India Pvt. Ltd.<br />

16 & 19 Exchangers M/s Shilpi Engg.<br />

19 Structural Jobs M/s St. Antony Engg.<br />

All Units Exchanger retubing M/s Arudra Engineering<br />

PIPING - FCCU, WAX, PROPYLENE, CT-2 / 7 and PSVs<br />

14 Piping - Replacement & Modification M/s Rotostat services Pvt. Ltd.<br />

16 & 19 Piping - Replacement & Modification M/s Shilpi Engg.<br />

CT-2 Piping - Replacement & Modification M/s AEMS Pvt. Ltd.<br />

All Units PSVs Amurtha Engineering<br />

OFFSITE - (FLARE EQUIPMENT & PIPING, CULVERT PIPING)<br />

Offsite Flare equipment replacement M/s Shilpi Engg.<br />

Offsite Culvert Piping - Replacement & Modification M/s AEMS Pvt. Ltd.<br />

DECONTAMINATION<br />

CDU/FCC Decontamination Jobs M/s Spanchem Technologies<br />

INSPECTION EXECUTIVE SUMMARY<br />

38<br />

<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />

<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!