There was delay, quality issues observed in erecting scaffolding for hot pipelines along with insulation<br />
removal during the shutdown outage and this led to delay in thickness gauging. In spite of repeated attempts<br />
to improve scaffolding completion, thickness gauging at some point during 30 th day of shutdown had to be<br />
stopped. In total, thickness gauging of 36 % of hot pipelines was completed.<br />
However, there were very few surprises on hot pipeline gauging which were recommended for replacement.<br />
Around 80% of modification drawings were taken up and executed. Balance could not be taken up due to<br />
resource constraints and paucity of time.<br />
Major structural staircase for CDU-<strong>II</strong> – Atmospheric column at top 6.0 mt elevation was already pre-fabricated<br />
& same was erected at site by project.<br />
Most of the structural work replacement planned earlier was executed during the shutdown except platform<br />
replacement in the debutanizer columns near FCCU New Gas con. area.<br />
Bench testing of 210 nos. of PSV/TSVs was completed against 373 nos. and 72 nos. of PSV/TSVs were not<br />
taken up/ not released. Around 91 TSV’s / PSV’s found to be missing at site and action to be initiated for<br />
procurement.<br />
1.6.1.5 FLARE SYSTEM:<br />
Consolidated list of PSV/TSV bench testing executed..Unit wise<br />
There was no scope variation on Planned vs Actual wrt. Flare system and all jobs as planned were executed.<br />
However, flare derrick structurals reinforcement including replacement of ladder & platforms and painting of<br />
flare structures were done partially due to paucity of time.<br />
1.6.2 Contractor Performance & Quality Of Work<br />
1.6.2.1 MAJOR CONTRACTOR LIST<br />
Units Job Scope Contractor<br />
FCCU - RR CIRCUIT, HEATER (16-F-01), CO BOILER & CO-STACK<br />
16<br />
Mech. & Refrac. Jobs - R-R Circuit, 16-F-01, COB<br />
Refractory - CO Stack<br />
Structural Jobs<br />
HEATERS (CDU-2, WAX), PIPING (CDU-2)<br />
M/s L&T Heavy Engineering Division<br />
Civil - M/s Industrial Associates Ltd.<br />
M/s St. Antony Engg.<br />
14<br />
Mech. jobs- 14-F-01 & 14-F-101<br />
M/s Logos Engginering Pvt. Ltd.<br />
Refractory - 14-F-01 & 14-F-101<br />
Civil - M/s Lizamontagens Pvt. Ltd.<br />
Mech. & Refrac. jobs- 15-F-01A, 15-F-02A<br />
M/s L&T Heavy Engineering Division<br />
15<br />
Heaters - 15-F-01B & 15-F-02B<br />
M/s Excellent Projects India Pvt. Ltd.<br />
Refractory - 15-F-01B & 15-F-02B<br />
Civil - M/s Lizamontagens Pvt. Ltd.<br />
Piping - Replacement & Modification<br />
M/s Shilpi Engg. Ltd<br />
17 & 18 Piping - Replacement & Modification M/s Shilpi Engg. Ltd<br />
COLUMNS & VESSELS (All Units)<br />
14 Vessels M/s Logos Engginering Pvt. Ltd.<br />
15 VDU Top dome replacement M/s L&T Heavy Engineering Division<br />
15, 17 & 18 Vessels M/s Excellent Projects India Pvt. Ltd.<br />
16 & 19 Vessels M/s Shilpi Engg.<br />
HEAT EXCHANGERS (All Units)<br />
14 Exchangers M/s Logos Engginering Pvt. Ltd.<br />
15 15-E-43 M/s L&T Heavy Engineering Division<br />
15, 17 & 18 Exchangers M/s Excellent Projects India Pvt. Ltd.<br />
16 & 19 Exchangers M/s Shilpi Engg.<br />
19 Structural Jobs M/s St. Antony Engg.<br />
All Units Exchanger retubing M/s Arudra Engineering<br />
PIPING - FCCU, WAX, PROPYLENE, CT-2 / 7 and PSVs<br />
14 Piping - Replacement & Modification M/s Rotostat services Pvt. Ltd.<br />
16 & 19 Piping - Replacement & Modification M/s Shilpi Engg.<br />
CT-2 Piping - Replacement & Modification M/s AEMS Pvt. Ltd.<br />
All Units PSVs Amurtha Engineering<br />
OFFSITE - (FLARE EQUIPMENT & PIPING, CULVERT PIPING)<br />
Offsite Flare equipment replacement M/s Shilpi Engg.<br />
Offsite Culvert Piping - Replacement & Modification M/s AEMS Pvt. Ltd.<br />
DECONTAMINATION<br />
CDU/FCC Decontamination Jobs M/s Spanchem Technologies<br />
INSPECTION EXECUTIVE SUMMARY<br />
38<br />
<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />
<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />
39