mendation<br />

| Recommendations<br />

ommendations | Recommendati<br />

ns | Recommendations | Recommendation<br />

19-D-02 CAUSTIC TANK<br />

Replace the tank completely<br />

19-X-01 COALESCER<br />

It is recommended to open the top manway and remove the grids for maintenance during the next M&I S/D.<br />

8.6.2 EXCHANGERS<br />

19-E-02 / 2B C3-C4 Splitter OVHD Condenser<br />

Replace the Channel pass partition plate.<br />

Anticipate Floating head cover weld repair.<br />

Procure new Connecting piece.<br />

19-E-04 / 4B C3-C3 Splitter OVHD Condenser<br />

Replace the Channel pass partition plate.<br />

Anticipate Floating head cover weld repair.<br />

ecommendations | Recommendations | Recommenda<br />

tions | Recommendations | Recommendations | Recommendatio<br />

Procure new Connecting pieces.<br />

19-E-06 C4 Cooler<br />

Anticipate Channel pass partition plate weld repair.<br />

19-E-34 BB Feed Stock Cooler<br />

Vent and drain have to be provided for tube test during next opportunity.<br />

19-E-36 Gasoline Cooler<br />

Anticipate Replacement of outer and inner pipe in next M&I.<br />

| Recommendations | Recommendations | Recommendations | Rec<br />

8.7 REFINERY-<strong>II</strong> FLARE SYSTEM & OFFSITE PIPING/ STRUCTURAL<br />

8.7.1 COLUMNS & VESSELS<br />

dations | Recommendations | Recommendations | Recommendatio<br />

29-C-05 HC FLARE KOD<br />

Suitable protective coating for internal to prevent corrosion, pitting & rusting shall be explored.<br />

Anticipate patch repair works in the next M&I shutdown.<br />

8.7.2 CULVERT & OFFSITE PIPING:<br />

s | Recommendations | Recommendations | Recommendations | R<br />

Pipelines found not in use (Redundant- 2nos.) shall be cut & removed in consultation with Mfg.<br />

Pipeline (Not released for HT- 1 No.) shall be Hydro tested during Ref-3 M&I shutdown or in the next available<br />

opportunity.<br />

endations | Recommendations | Recommendations | Recommenda<br />

716<br />

Replace channel pass partition plate.<br />

14-E-103C SECOND STAGE EFFLUENT WAX FEED HEATER<br />

Replace channel pass partition plate.<br />

14-E-105 STRIPPER OVERHEAD CONDENSER<br />

Anticipate retubing in next M&I.<br />

Procure new connecting piece.<br />

8.6 PROPYLENE RECOVERY UNIT & FEED PREPARATION UNIT (PLANT-19)<br />

8.6.1 COLUMNS & VESSELS<br />

19-C-01 C3-C4 SPLITTER COLUMN<br />

Partial replacement of splitter column shell between EL 2600 (Tray no 4) to EL 11800(Manway 3).<br />

Replace platform 2 chequered plates with EIL Type <strong>II</strong> gratings (2 square meter).<br />

Skirt fire-proofing shall be removed at 3 locations to assess the condition of skirt plate.<br />

Anticipate for patch work repairs in next M&I.<br />

Damaged foundation to be rectified in next available opportunity.<br />

19-C-02 C3-C3 SPLITTER COLUMN<br />

Complete skirt fire proofing renewal shall be done at the earliest.<br />

Anticipate patch plate welding on skirt plate (1 square meter)<br />

Patched 2” LT nozzle near skirt to be replaced.<br />

19-C-11 CONDENSATE POT OF 19-E-03<br />

Monitor the thickness 3” Nozzle A , 2” SP1 nozzle and 2” SP2 nozzle in the next M&I.<br />

19-C-12 CONDENSATE POT OF 19-E-05<br />

Anticipate replacement SP2, B & V nozzles in next M&I S/D.<br />

19-C-31 BB FRACTIONATOR COLUMN<br />

Complete insulation renewal shall be carried out in next available opportunity.<br />

Anticipate patch repair on shell in the next M &I S/D.<br />

Skirt fire-proofing shall be removed at 3 locations to assess the condition of skirt plate.<br />

Anticipate for patch work repairs in next M&I.<br />

Platform chequered plates of (4 nos) to be replaced with EIL type <strong>II</strong> profile gratings (Approx 50 Square meters )<br />

19-C-32 BUTENE SIDE RECTIFIER<br />

Anticipate Replacement of shell in the next M&I S/D.<br />

19-D-01 DM WATER TANK<br />

Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />

Technical - Inspection<br />

Leg support fire proofing (3 nos) to be rectified<br />

Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />

Technical - Inspection<br />

Recommendations | Recommendations | Recommendations | Re<br />

<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />

ions | Recommendations | Recommendations | Recommendati<br />

dations | Recommendations | Recommendations |<br />

tions | Recommendations | Recommend<br />

ndations | Recommendations<br />

ations | Recomm<br />

endati<br />

<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />

717<br />

CONSOLIDATED SHUTDOWN<br />

RECOMMENDATIONS