19-D-02 CAUSTIC TANK<br />
Replace the tank completely<br />
19-X-01 COALESCER<br />
It is recommended to open the top manway and remove the grids for maintenance during the next M&I S/D.<br />
8.6.2 EXCHANGERS<br />
19-E-02 / 2B C3-C4 Splitter OVHD Condenser<br />
Replace the Channel pass partition plate.<br />
Anticipate Floating head cover weld repair.<br />
Procure new Connecting piece.<br />
19-E-04 / 4B C3-C3 Splitter OVHD Condenser<br />
Replace the Channel pass partition plate.<br />
Anticipate Floating head cover weld repair.<br />
ecommendations | Recommendations | Recommenda<br />
tions | Recommendations | Recommendations | Recommendatio<br />
Procure new Connecting pieces.<br />
19-E-06 C4 Cooler<br />
Anticipate Channel pass partition plate weld repair.<br />
19-E-34 BB Feed Stock Cooler<br />
Vent and drain have to be provided for tube test during next opportunity.<br />
19-E-36 Gasoline Cooler<br />
Anticipate Replacement of outer and inner pipe in next M&I.<br />
| Recommendations | Recommendations | Recommendations | Rec<br />
8.7 REFINERY-<strong>II</strong> FLARE SYSTEM & OFFSITE PIPING/ STRUCTURAL<br />
8.7.1 COLUMNS & VESSELS<br />
dations | Recommendations | Recommendations | Recommendatio<br />
29-C-05 HC FLARE KOD<br />
Suitable protective coating for internal to prevent corrosion, pitting & rusting shall be explored.<br />
Anticipate patch repair works in the next M&I shutdown.<br />
8.7.2 CULVERT & OFFSITE PIPING:<br />
s | Recommendations | Recommendations | Recommendations | R<br />
Pipelines found not in use (Redundant- 2nos.) shall be cut & removed in consultation with Mfg.<br />
Pipeline (Not released for HT- 1 No.) shall be Hydro tested during Ref-3 M&I shutdown or in the next available<br />
opportunity.<br />
endations | Recommendations | Recommendations | Recommenda<br />
716<br />
Replace channel pass partition plate.<br />
14-E-103C SECOND STAGE EFFLUENT WAX FEED HEATER<br />
Replace channel pass partition plate.<br />
14-E-105 STRIPPER OVERHEAD CONDENSER<br />
Anticipate retubing in next M&I.<br />
Procure new connecting piece.<br />
8.6 PROPYLENE RECOVERY UNIT & FEED PREPARATION UNIT (PLANT-19)<br />
8.6.1 COLUMNS & VESSELS<br />
19-C-01 C3-C4 SPLITTER COLUMN<br />
Partial replacement of splitter column shell between EL 2600 (Tray no 4) to EL 11800(Manway 3).<br />
Replace platform 2 chequered plates with EIL Type <strong>II</strong> gratings (2 square meter).<br />
Skirt fire-proofing shall be removed at 3 locations to assess the condition of skirt plate.<br />
Anticipate for patch work repairs in next M&I.<br />
Damaged foundation to be rectified in next available opportunity.<br />
19-C-02 C3-C3 SPLITTER COLUMN<br />
Complete skirt fire proofing renewal shall be done at the earliest.<br />
Anticipate patch plate welding on skirt plate (1 square meter)<br />
Patched 2” LT nozzle near skirt to be replaced.<br />
19-C-11 CONDENSATE POT OF 19-E-03<br />
Monitor the thickness 3” Nozzle A , 2” SP1 nozzle and 2” SP2 nozzle in the next M&I.<br />
19-C-12 CONDENSATE POT OF 19-E-05<br />
Anticipate replacement SP2, B & V nozzles in next M&I S/D.<br />
19-C-31 BB FRACTIONATOR COLUMN<br />
Complete insulation renewal shall be carried out in next available opportunity.<br />
Anticipate patch repair on shell in the next M &I S/D.<br />
Skirt fire-proofing shall be removed at 3 locations to assess the condition of skirt plate.<br />
Anticipate for patch work repairs in next M&I.<br />
Platform chequered plates of (4 nos) to be replaced with EIL type <strong>II</strong> profile gratings (Approx 50 Square meters )<br />
19-C-32 BUTENE SIDE RECTIFIER<br />
Anticipate Replacement of shell in the next M&I S/D.<br />
19-D-01 DM WATER TANK<br />
Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />
Technical - Inspection<br />
Leg support fire proofing (3 nos) to be rectified<br />
Chennai Petroleum Corporation Limited (A group company of Indian Oil)<br />
Technical - Inspection<br />
Recommendations | Recommendations | Recommendations | Re<br />
<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />
ions | Recommendations | Recommendations | Recommendati<br />
dations | Recommendations | Recommendations |<br />
tions | Recommendations | Recommend<br />
ndations | Recommendations<br />
ations | Recomm<br />
endati<br />
<strong>Refinery</strong> - <strong>II</strong> M&I S/D <strong>Oct</strong>-<strong>Nov</strong> <strong>2018</strong> - Inspection Report<br />
717<br />
CONSOLIDATED SHUTDOWN<br />
RECOMMENDATIONS