Northern Gateway Pipelines Inc.<br />

<strong>Section</strong> <strong>3.10</strong>: <strong>Site</strong> <strong>Plans</strong> <strong>and</strong> <strong>Technical</strong> <strong>Data</strong><br />

Table of Contents<br />

Figure 2-4 OCIMF Guidelines for Tanker Berth Layout (Reference 19)<br />

Two different configurations of these functional elements are shown in Drawing Nos. 003, 003A, 004 <strong>and</strong><br />

004A. For both options, the central loading / unloading platform provides the interface for transferring<br />

cargo between the ship <strong>and</strong> the on-shore tank facilities. Located in the middle of each berth, the central<br />

platform will be an independent structure that supports the cargo transfer arms <strong>and</strong> will have a deck<br />

surface approximately 35 metres wide <strong>and</strong> 58 metres long. Piping, loading arms <strong>and</strong> other equipment will<br />

take up a portion of the deck space <strong>and</strong> the remaining area will be available for maintenance vehicle<br />

access such as a mobile crane or truck.<br />

January 20, 2010 FINAL - Rev. 0 Page 2-9