Northern Gateway Pipelines Inc.<br />
<strong>Section</strong> <strong>3.10</strong>: <strong>Site</strong> <strong>Plans</strong> <strong>and</strong> <strong>Technical</strong> <strong>Data</strong><br />
Table of Contents<br />
Figure 4-1 Docking Monitoring System Display Board<br />
(Source: Harbour & Marine Engineering)<br />
4.13 Quick Release Hooks <strong>and</strong> Mooring Load Monitoring System<br />
Quick release hooks are st<strong>and</strong>ard equipment for marine oil terminals. They provide a safe <strong>and</strong> efficient<br />
means of securing a vessel alongside the berth <strong>and</strong>, in an emergency situation, can allow for the rapid<br />
release of mooring lines even while under full tension.<br />
As shown in Figure 4-2, a quick release hook is a steel assembly with one or more pivoting hooks which<br />
can swivel to accommodate mooring lines coming from different angles <strong>and</strong> inclinations from the ship.<br />
Quick release hooks can be manufactured with either single, double, triple, or quadruple hooks depending<br />
on the terminal’s requirements.<br />
Page 4-8 FINAL - Rev. 0 January 20, 2010