04.01.2013 Views

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Northern Gateway Pipelines Inc.<br />

<strong>Section</strong> <strong>3.10</strong>: <strong>Site</strong> <strong>Plans</strong> <strong>and</strong> <strong>Technical</strong> <strong>Data</strong><br />

Table of Contents<br />

Figure 4-1 Docking Monitoring System Display Board<br />

(Source: Harbour & Marine Engineering)<br />

4.13 Quick Release Hooks <strong>and</strong> Mooring Load Monitoring System<br />

Quick release hooks are st<strong>and</strong>ard equipment for marine oil terminals. They provide a safe <strong>and</strong> efficient<br />

means of securing a vessel alongside the berth <strong>and</strong>, in an emergency situation, can allow for the rapid<br />

release of mooring lines even while under full tension.<br />

As shown in Figure 4-2, a quick release hook is a steel assembly with one or more pivoting hooks which<br />

can swivel to accommodate mooring lines coming from different angles <strong>and</strong> inclinations from the ship.<br />

Quick release hooks can be manufactured with either single, double, triple, or quadruple hooks depending<br />

on the terminal’s requirements.<br />

Page 4-8 FINAL - Rev. 0 January 20, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!