Northern Gateway Pipelines Inc.<br />

<strong>Section</strong> <strong>3.10</strong>: <strong>Site</strong> <strong>Plans</strong> <strong>and</strong> <strong>Technical</strong> <strong>Data</strong><br />

Table of Contents<br />

Table of Contents (continued)<br />

4.18 Operational Safety Procedures <strong>and</strong> Facilities ................................................. 4-16<br />

4.18.1 Terminal Operational Safety Procedures .................................................... 4-16<br />

4.18.2 Port Information Booklet <strong>and</strong> Terminal Regulations .................................... 4-17<br />

4.18.3 Cargo Transfer Safety Procedures .............................................................. 4-17<br />

4.18.4 Security ........................................................................................................ 4-18<br />

4.18.5 Safety Facilities Summary ........................................................................... 4-18<br />

4.19 Intended Berthing Strategy ............................................................................. 4-19<br />

5 References ..................................................................................................... 5-1<br />

Appendix A Marine Terminal Drawings .................................................... A-1<br />

Appendix B Engineering St<strong>and</strong>ards .......................................................... B-1<br />

List of Tables<br />

Table 3-1 Wind Speed versus Wind Direction ........................................................ 3-1<br />

Table 3-2 Recorded Wave Height at Nanakwa Shoal ............................................. 3-5<br />

Table 3-3 Estimated Wave Height <strong>and</strong> Period at Project <strong>Site</strong> ................................. 3-5<br />

Table 3-4 Tide Levels ............................................................................................. 3-6<br />

Table 4-1 Design Tanker Vessel Characteristics .................................................... 4-1<br />

Table 4-2 Proposed Oil Design Flow Rates, Pressures, Temperatures, <strong>and</strong><br />

Liquid Characteristics ............................................................................. 4-4<br />

Table 4-3 Proposed Condensate Design Flow Rates, Pressures,<br />

Temperatures, <strong>and</strong> Liquid Characteristics .............................................. 4-5<br />

Table 4-4 Fire Suppression Operating Parameters ................................................ 4-6<br />

January 20, 2010 FINAL - Rev. 0 Page iii