04.01.2013 Views

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Northern Gateway Pipelines Inc.<br />

<strong>Section</strong> <strong>3.10</strong>: <strong>Site</strong> <strong>Plans</strong> <strong>and</strong> <strong>Technical</strong> <strong>Data</strong><br />

<strong>Section</strong> 5: References<br />

16. Moffatt & Nichol, 2010. Vessel Wake Study. Final report prepared for Enbridge Gateway<br />

Pipelines. Inc., December 1, 2006.<br />

17. Northern Gateway Pipelines Ltd. Volume III: NEB Application. Draft “O”, Dec. 2008.<br />

18. Colt Engineering. Design Basis Summary RPT-005 06C5951. Nov. 2006.<br />

19. OCIMF. Mooring Equipment Guidelines. Second Edition 1997.<br />

20. 3Si Risk Strategies Incorporated. Enbridge – Northern Gateway Kitimat Terminal, Marine<br />

Facility Security Overview. Nov 2009. (Included in TERMPOL Submission Volume 2).<br />

Page 5-2 FINAL - Rev. 0 January 20, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!