04.01.2013 Views

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

Section 3.10: Site Plans and Technical Data - Rick Neufeld Comments

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Northern Gateway Pipelines Inc.<br />

<strong>Section</strong> <strong>3.10</strong>: <strong>Site</strong> <strong>Plans</strong> <strong>and</strong> <strong>Technical</strong> <strong>Data</strong><br />

Table of Contents<br />

1 Objectives<br />

The objective of this study is to demonstrate the preliminary terminal design that has been conducted in<br />

support of the project, as addressed by the following engineering plans <strong>and</strong> associated development<br />

studies:<br />

• Marine terminal plans, including site plans, general arrangements, bathymetry <strong>and</strong> structural<br />

drawings;<br />

• <strong>Site</strong> studies, including turning basins, vessel manoeuvres, dredge <strong>and</strong> fill work, <strong>and</strong> geotechnical data;<br />

• Environmental studies, including wind, wave, tide, current, ice, <strong>and</strong> temperature data;<br />

• Design parameters, including design vessels, clearance requirements, <strong>and</strong> derivation of loads;<br />

• Maximum operating parameters;<br />

• Relevant engineering st<strong>and</strong>ards, codes <strong>and</strong> recommended guidelines;<br />

• Description of design flow rates, pressures, temperatures <strong>and</strong> liquid characteristics in the cargo<br />

transfer system;<br />

• Description of safety systems <strong>and</strong> procedures, including fire protection, electrical, lighting, marine<br />

monitoring, control <strong>and</strong> instrumentation, leak detection;<br />

• Description of pollution prevention <strong>and</strong> waste management programs <strong>and</strong> systems; <strong>and</strong>,<br />

• Description of intended berthing strategy.<br />

January 20, 2010 FINAL - Rev. 0 Page 1-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!