Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited,<br />

Madadeni Opencast <strong>Mining</strong> Project Page 5<br />

Department of Water and Environmental Affairs (DWEA)<br />

National Department of Agriculture (NDA)<br />

1.3 L E G AL R E Q U I R E M E N T S<br />

The Mineral and Petroleum Resources Development Act, 2002 (Act 28 of 2002) (MPRDA) requires<br />

that an Environmental Impact Assessment (EIA) be conducted and that the Environmental<br />

Management Programme (EMP) be compiled for any new mining operation.<br />

In addition to the MPRDA, the following key legislation is also relevant to the EMPR Amendment:<br />

Environment Conservation Act (ECA), No 73 of 1989<br />

The National Environmental Management Act (NEMA), No 107 of 1998<br />

The Mine Health and Safety Act (MHSA), No 29 of 1996, as amended<br />

The National Water Act (NWA), No 36 of 1998, as amended<br />

National Environmental Management Biodiversity Act (NEMBA), No 10 of 2004<br />

Air Quality Act (AQA), No 39 of 2004.<br />

Scoping is the first phase of the EIA. This defines the nature and extent of the impact assessment<br />

required. Preliminary environmental screening indicates that there are no potentially major<br />

environmental issues associated with development and operation of the proposed Madadeni<br />

Opencast <strong>Mining</strong> Project.<br />

A Scoping Report was circulated in March 2010 to the relevant authorities for comments.<br />

The EIA/EMP Report (this report) will be evaluated by the public before being finalised based on the<br />

comments received from interested and affected parties. On finalisation, the report will further be<br />

evaluated by the relevant authorities including DMR before DMR can make a decision on granting or<br />

refusal of the report.<br />

1.4 P U R P O S E O F T H E EI A/EMP REPO R T<br />

The EIA/EMP report addresses the requirements of the Scoping and Impact Assessment Phases as<br />

outlined in the EIA regulations. This report documents the issues and concerns raised during the<br />

Scoping phase, and includes the findings of the specialist assessments for issues that have been<br />

raised.<br />

The aim of this EIA Report is to:<br />

Provide information on the proposed project and present the findings of the EIA to the authorities<br />

Provide information regarding alternatives that have been considered<br />

Show how authorities and interested and affected parties were afforded the opportunity to contribute<br />

to the project, and to indicate the issues raised and the responses to those issues<br />

Describe the baseline receiving environment<br />

Describe the extent of environmental consequences for the construction and operating phases of the<br />

proposed project<br />

Propose mitigation measures for impacts that are considered significant<br />

Describe the environmental feasibility of the proposed project<br />

Present findings of the EIA in a manner that facilitates decision-making by the relevant authorities<br />

<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong><br />

COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!