Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />

<strong>Mining</strong> Project Page 60<br />

Construction of the initial box cuts<br />

(opencast pits)<br />

The land occupier will not be able to continue<br />

with the current land use since the land will be<br />

lost to mining.<br />

Interested and affected parties are given an<br />

opportunity to comment on the issues raised in<br />

the EIA.<br />

<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD<br />

S<br />

S<br />

H<br />

H<br />

H<br />

M<br />

Nkomati Anthracite (Pty) Limited has<br />

reach an agreement with the<br />

landowner and the land occupier on<br />

their ground. See Appendix 4 for a<br />

copy of the agreement between the<br />

Mawewe Royal Family Trust and<br />

Mawewe Community Trust and<br />

Nkomati Anthracite (Pty) Ltd.<br />

Any comments raised will be<br />

addressed in the final draft EIA/EMP<br />

Report.<br />

Confidential<br />

R 100 000<br />

ANNUAL REHABILITATION CONSTRUCTION COSTS (SUB-TOTAL) R 1 399 000<br />

6.3.3 O P E R AT I O N AL P H A S E<br />

ACTIVITY IMPACT IMPACT<br />

ASSESSMENT<br />

Operation of the opencast mine workings Removal of coal by opencast mining and<br />

subsequent replacement of overburden<br />

material during the mining will result in the<br />

disturbance of the geological layers<br />

overlying the target coal seams.<br />

Opening of opencast pits during mining will<br />

result in the formation of voids, which will<br />

alter the local topographical patterns within<br />

the immediate mining area.<br />

Rehabilitated areas may show areas of<br />

localised water ponding and impaired<br />

drainage.<br />

E P S<br />

MITIGATION MEASURES ANNUAL COST CLOSURE<br />

COST<br />

S H M No mitigation can be undertaken<br />

for this impact. The mine will<br />

however replace the overburden<br />

material in the mined out opencast<br />

S<br />

S<br />

H<br />

H<br />

M<br />

L<br />

pits.<br />

<strong>Mining</strong> must be undertaken<br />

concurrently with rehabilitation. A<br />

maximum of three cuts in each<br />

mining area must be operational at<br />

any time during mining.<br />

Ensure that the rehabilitated areas<br />

maintain safe slopes and the area<br />

is free draining.<br />

<strong>Mining</strong> cost<br />

<strong>Mining</strong> cost<br />

R 500 000