Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 60<br />
Construction of the initial box cuts<br />
(opencast pits)<br />
The land occupier will not be able to continue<br />
with the current land use since the land will be<br />
lost to mining.<br />
Interested and affected parties are given an<br />
opportunity to comment on the issues raised in<br />
the EIA.<br />
<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD<br />
S<br />
S<br />
H<br />
H<br />
H<br />
M<br />
Nkomati Anthracite (Pty) Limited has<br />
reach an agreement with the<br />
landowner and the land occupier on<br />
their ground. See Appendix 4 for a<br />
copy of the agreement between the<br />
Mawewe Royal Family Trust and<br />
Mawewe Community Trust and<br />
Nkomati Anthracite (Pty) Ltd.<br />
Any comments raised will be<br />
addressed in the final draft EIA/EMP<br />
Report.<br />
Confidential<br />
R 100 000<br />
ANNUAL REHABILITATION CONSTRUCTION COSTS (SUB-TOTAL) R 1 399 000<br />
6.3.3 O P E R AT I O N AL P H A S E<br />
ACTIVITY IMPACT IMPACT<br />
ASSESSMENT<br />
Operation of the opencast mine workings Removal of coal by opencast mining and<br />
subsequent replacement of overburden<br />
material during the mining will result in the<br />
disturbance of the geological layers<br />
overlying the target coal seams.<br />
Opening of opencast pits during mining will<br />
result in the formation of voids, which will<br />
alter the local topographical patterns within<br />
the immediate mining area.<br />
Rehabilitated areas may show areas of<br />
localised water ponding and impaired<br />
drainage.<br />
E P S<br />
MITIGATION MEASURES ANNUAL COST CLOSURE<br />
COST<br />
S H M No mitigation can be undertaken<br />
for this impact. The mine will<br />
however replace the overburden<br />
material in the mined out opencast<br />
S<br />
S<br />
H<br />
H<br />
M<br />
L<br />
pits.<br />
<strong>Mining</strong> must be undertaken<br />
concurrently with rehabilitation. A<br />
maximum of three cuts in each<br />
mining area must be operational at<br />
any time during mining.<br />
Ensure that the rehabilitated areas<br />
maintain safe slopes and the area<br />
is free draining.<br />
<strong>Mining</strong> cost<br />
<strong>Mining</strong> cost<br />
R 500 000