Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 72<br />
6.4.6 An i m a l L i f e<br />
Normally following cessation of mining activities in the area, animals will begin to migrate back into the<br />
area within 2 years.<br />
No significant residual impacts on animal life will therefore occur.<br />
6.4.7 S u r f ac e W a t e r<br />
6 . 4 . 7 . 1 S u r f a c e W at e r Q u a n t i t y<br />
Following re-establishment of natural runoff patterns by rehabilitation and shaping of the disturbed<br />
areas, and removing of the pollution control dam, all diversion trenches and berms, surface water<br />
runoff will re-establish.<br />
No significant residual impacts are therefore predicted.<br />
6 . 4 . 7 . 2 S u r f a c e W at e r Q u a l i t y<br />
Following rehabilitation of the disturbed areas, all sources of dirty water from the mining area will be<br />
eliminated. In view of this, no dirty water will be emanating from the mining area.<br />
No significant residual impacts are therefore predicted.<br />
6.4.8 G r o u n d w a t e r<br />
This phase of the mining operation is the period following the completion of mining and rehabilitation<br />
of the Madadeni <strong>Mining</strong> Area. The following possible impacts were identified at this stage:<br />
<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD