Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />

<strong>Mining</strong> Project Page 55<br />

6 . 2 . 3 . 1 . 2 . S e c o n d a r y Ac t i vit i e s<br />

Rehabilitation of overburden stockpile areas<br />

After the removal of overburden material for backfilling of the final voids, the stockpile areas will be<br />

ripped to 100mm and covered with a layer of topsoil. Sections used to access the areas will be ripped<br />

to 250 mm before being covered with topsoil for seeding.<br />

Rehabilitation of the pollution control dam and the diversion trenches/berms<br />

The pollution control dam will be cleaned out and filled with stockpiled subsoil. A layer of topsoil will<br />

be spread over the rehabilitated surface.<br />

The clean and dirty water diversion trenches will be cleaned out and filled, after the rehabilitation of<br />

the stockpiling area. Berms will be pushed into the trenches as filling material.<br />

Seeding of rehabilitated areas<br />

Following mechanical rehabilitation of the area, a seed mix will be applied to all rehabilitated areas to<br />

accelerate vegetation establishment. The species to be used for seeding will be based on the<br />

vegetation specialist recommendation.<br />

Maintenance and monitoring of rehabilitated and surrounding environments<br />

All rehabilitated areas will be monitored for cracks, erosion and settlements. All cracks, erosion<br />

gullies and settlement depressions will be repaired.<br />

Data gathered from the above maintenance and from a monitoring programme will be used for the<br />

application of a closure certificate.<br />

6 . 2 . 3 . 2 P r o c e s s es<br />

No activities warranting a process will be undertaken at the proposed Madadeni Opencast <strong>Mining</strong><br />

area during this phase.<br />

6.3 S E C T I O N 39(B) ( I), S E C T I O N 39(B)(II), S E C T I O N (39)(4)(A)(III),<br />

S E C T I O N 37(2) O F T H E MPRD A A N D R E G U L AT I O N S 11(1)(G )(IV) AN D<br />

50(C) O F T H E R E G U L A T I O N S U N D E R T H E MPRDA: I M P AC T<br />

AS S E S S M E N T A N D D E T E R M I N AT I O N O F T H E C O S T O F M I T I G AT I O N<br />

M E AS U R E S<br />

The tables below describe the assessment of impacts from the proposed mining operations, its<br />

associated activities and the changes in the existing Nkomati Anthracite mining operations. Note that<br />

under the assessment the following abbreviations i.e. E, P and S were used, which stands for Extent,<br />

Probability and Significance respectively.<br />

The assessment also shows the cost for the mitigation measures that has been properly budgeted for<br />

by Nkomati Anthracite (Pty) Limited. The annual budget for Nkomati Anthracite (Pty) Limited showing<br />

money put aside for the management of environmental impacts as determined under the impact<br />

assessment is attached as Appendix 5.<br />