Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 52<br />
6 . 2 . 1 . 1 Act i vit i e s<br />
6 . 2 . 1 . 1 . 1 . P r i m a r y Ac t i vi t i e s<br />
Construction of Access and Haul Roads<br />
The current existing secondary road and a new access road connecting to the secondary will be used<br />
to access the mine. A new access or hail road will be constructed to connect the existing Nkomati<br />
Anthracite Mine to the proposed Madadeni Opencast mining area. Haul roads will also be<br />
constructed for the haulage of coal from the opencast to the R.O.M. coal stockpile at the opencast<br />
area.<br />
Construction of a run of mine (R.O.M.) coal stockpiling area<br />
A new R.O.M. coal stockpiling area will be constructed within the vicinity of the proposed Opencast<br />
area. This will be used for the stockpiling of run of mine coal. The R.O.M. coal stockpile area will<br />
have enough space to contain approximately 40 000 tonnes of R.O.M.. The stockpiles will not exceed<br />
a height of 4m. Besides the use for loading coal from the mining area, the other reason for the<br />
R.O.M. stockpile will be to cater for coal if any breakdowns or work stoppages within the workings<br />
occur, resulting in a cease in production (financial implications).<br />
As with all other construction sites, topsoil from the new and upgraded R.O.M coal stockpile will be<br />
stripped and stockpiled as per the recommendation from the soil specialist report.<br />
Excavation of initial box cuts<br />
An initial box cut will be constructed at the proposed Madadeni Opencast mining area. Access pit<br />
ramps will be constructed within each of the box cuts for access to the mining pits. These will be<br />
constructed to have a maximum slope of 12°. Topsoil from the initial box cuts will be stripped to a<br />
depth as specified by the soil specialist and will be removed to the relevant topsoil stockpile. Subsoil<br />
from the box cuts will be stripped and stockpiled separately at the subsoil stockpile.<br />
Hard overburden material from the initial box cuts will be drilled, blasted and removed to the hards<br />
overburden stockpile. Finally all coal material will be drilled, blasted, removed to the R.O.M. coal<br />
stockpile and thereafter crushed and screened before being sold to the destined clients.<br />
Preparation and Formation of the Topsoil, Subsoil and Hard Overburden Stockpiles<br />
Topsoil from the overburden (subsoil and hards) stockpiling areas will be stripped to the soil depth of<br />
the particular area as determined by the soil survey. This will be stockpiled as per the<br />
recommendation from the soil specialist report.<br />
Note that topsoil will be removed from all stockpiling areas prior to formation of the overburden<br />
stockpiles.<br />
All topsoil, subsoil and overburden material removed during the construction phase will be stockpiled,<br />
separately.<br />
The topsoil stockpiles will be placed such that they do not exceed a height of 4m. This height is<br />
enough to reduce leaching impacts of the stockpiled topsoil.<br />
6 . 2 . 1 . 1 . 2 . S e c o n d a r y Ac t i vit i e s<br />
Construction of the Pollution Control Dam<br />
A pollution control dam will be constructed at the proposed mining area. The pollution control dam has<br />
been designed by a civil engineer; hence the dam will be constructed to have sufficient capacity to<br />
handle all dirty water emanating from the dirty water areas of the mining area. The pollution control<br />