Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />

<strong>Mining</strong> Project Page 52<br />

6 . 2 . 1 . 1 Act i vit i e s<br />

6 . 2 . 1 . 1 . 1 . P r i m a r y Ac t i vi t i e s<br />

Construction of Access and Haul Roads<br />

The current existing secondary road and a new access road connecting to the secondary will be used<br />

to access the mine. A new access or hail road will be constructed to connect the existing Nkomati<br />

Anthracite Mine to the proposed Madadeni Opencast mining area. Haul roads will also be<br />

constructed for the haulage of coal from the opencast to the R.O.M. coal stockpile at the opencast<br />

area.<br />

Construction of a run of mine (R.O.M.) coal stockpiling area<br />

A new R.O.M. coal stockpiling area will be constructed within the vicinity of the proposed Opencast<br />

area. This will be used for the stockpiling of run of mine coal. The R.O.M. coal stockpile area will<br />

have enough space to contain approximately 40 000 tonnes of R.O.M.. The stockpiles will not exceed<br />

a height of 4m. Besides the use for loading coal from the mining area, the other reason for the<br />

R.O.M. stockpile will be to cater for coal if any breakdowns or work stoppages within the workings<br />

occur, resulting in a cease in production (financial implications).<br />

As with all other construction sites, topsoil from the new and upgraded R.O.M coal stockpile will be<br />

stripped and stockpiled as per the recommendation from the soil specialist report.<br />

Excavation of initial box cuts<br />

An initial box cut will be constructed at the proposed Madadeni Opencast mining area. Access pit<br />

ramps will be constructed within each of the box cuts for access to the mining pits. These will be<br />

constructed to have a maximum slope of 12°. Topsoil from the initial box cuts will be stripped to a<br />

depth as specified by the soil specialist and will be removed to the relevant topsoil stockpile. Subsoil<br />

from the box cuts will be stripped and stockpiled separately at the subsoil stockpile.<br />

Hard overburden material from the initial box cuts will be drilled, blasted and removed to the hards<br />

overburden stockpile. Finally all coal material will be drilled, blasted, removed to the R.O.M. coal<br />

stockpile and thereafter crushed and screened before being sold to the destined clients.<br />

Preparation and Formation of the Topsoil, Subsoil and Hard Overburden Stockpiles<br />

Topsoil from the overburden (subsoil and hards) stockpiling areas will be stripped to the soil depth of<br />

the particular area as determined by the soil survey. This will be stockpiled as per the<br />

recommendation from the soil specialist report.<br />

Note that topsoil will be removed from all stockpiling areas prior to formation of the overburden<br />

stockpiles.<br />

All topsoil, subsoil and overburden material removed during the construction phase will be stockpiled,<br />

separately.<br />

The topsoil stockpiles will be placed such that they do not exceed a height of 4m. This height is<br />

enough to reduce leaching impacts of the stockpiled topsoil.<br />

6 . 2 . 1 . 1 . 2 . S e c o n d a r y Ac t i vit i e s<br />

Construction of the Pollution Control Dam<br />

A pollution control dam will be constructed at the proposed mining area. The pollution control dam has<br />

been designed by a civil engineer; hence the dam will be constructed to have sufficient capacity to<br />

handle all dirty water emanating from the dirty water areas of the mining area. The pollution control<br />