Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 54<br />
sewage treatment and collection and waste management (water, domestic waste and industrial<br />
waste).<br />
Haul roads will be used for the haulage of overburden material to the stockpiling area and haulage of<br />
run of mine coal to the R.O.M. coal stockpile. Haul roads will also be used by mine personnel vehicle<br />
to access to the opencast pit areas. Access roads will be used by the mine personnel for accessing<br />
the mine area and will also be used by haulage trucks transporting coal from the mine to the destined<br />
clients.<br />
6 . 2 . 2 . 1 . 2 . S e c o n d a r y Ac t i vit i e s<br />
Disposal of Mine Affected Water into the Pollution control dam<br />
A pollution control dam will be constructed during the construction phase of mining. The dam will<br />
comply with all regulatory requirements. The dam will have sufficient capacity to cater for seepage<br />
water from the opencast pit and any dirty water runoff captured by the dirty water diversion trenches<br />
from the dirty water areas of the mine.<br />
All dirty water emanating from the mining area will be contained into the dam. Additional water from a<br />
1:50 year 24-hour rainfall event, captured within the dam and all dirty water areas, will also be<br />
retained within the pollution control dam.<br />
6 . 2 . 2 . 2 P r o c e s s es<br />
No activities warranting a process will be undertaken at the proposed Madadeni Opencast area during<br />
its construction phase.<br />
6.2.3 De c o m m i s s i o n i n g an d C l o su r e Ph a s e<br />
6 . 2 . 3 . 1 Act i vit i e s<br />
6 . 2 . 3 . 1 . 1 . P r i m a r y Ac t i vi t i e s<br />
Filling of final voids<br />
Backfilling and rehabilitation of these voids will be undertaken during the decommissioning phase.<br />
The hards, subsoil and topsoil overburden, stockpiled during the construction phase, will be used to<br />
backfill the final voids. The method of material placement will be placement of hards overburden,<br />
followed by subsoil material and finally a layer of topsoil. Topsoil placement will be as per<br />
recommendation from the soil specialist report. The final void (adit areas) will be filled to surface and<br />
shaped to ensure that the area is free draining.<br />
Rehabilitation of R.O.M. stockpile areas<br />
The R.O.M. coal stockpiling areas will be graded to a depth of 100 mm to remove all carbonaceous<br />
material build-up. In addition to this, the base of the R.O.M. coal stockpile areas will be removed and<br />
disposed of appropriately. Carbonaceous and non-hazardous material from the R.O.M. coal stockpile<br />
will be placed in the bottom of the final cuts prior to backfilling. All material used for the construction<br />
of the R.O.M. stockpile areas foundation will be removed and used for backfilling of the final voids.<br />
The areas will then be ripped to a depth of 100mm, covered with topsoil and seeded.<br />
Rehabilitation of access and haul roads<br />
All access and haul roads that will not be used after mining will be ripped, to a depth of 250mm to<br />
reduce compaction. The area will then be covered with a layer of topsoil before it can be seeded.<br />
<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD