Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />

<strong>Mining</strong> Project Page 69<br />

Rehabilitation of R.O.M stockpile area,<br />

access and haul roads, overburden<br />

stockpile areas and dirty water<br />

management structures.<br />

the intended after mining land use to be<br />

undertaken.<br />

Runoff from the backfilled final voids may<br />

contain elevated silt load, which will have<br />

negative impacts on the nearby stream,<br />

natural vegetation and stream’s aquatic<br />

ecosystem<br />

Backfilling and levelling of the final voids will<br />

result in the generation of dust. This, if not<br />

controlled, will have impacts on the<br />

neighbouring properties.<br />

The carbonaceous layer that could build up<br />

during the operational phase on the R.O.M<br />

coal stockpile area, pollution control<br />

structures and the access/haul roads may<br />

contaminate rehabilitated areas if not<br />

removed before use of material or<br />

rehabilitation of the areas. This may further<br />

affect the shallow groundwater aquifer and<br />

surface water within the affected areas.<br />

The activities will result in the generation of<br />

dust, which may have negative effects on the<br />

surrounding farmers’ fields and the sensitive<br />

landscapes.<br />

Water emanating from the above-mentioned<br />

areas will be considered dirty until the<br />

carbonaceous layers have been removed and<br />

disposed of.<br />

<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD<br />

S<br />

S<br />

S<br />

S<br />

S<br />

H<br />

H<br />

H<br />

H<br />

L<br />

M<br />

M<br />

M<br />

M<br />

L<br />

approximate pre-mining<br />

conditions, which is also<br />

dependent on the standard of<br />

rehabilitation.<br />

Construct contours to reduce the<br />

velocity of runoff storm water and<br />

establish vegetation as soon as<br />

possible after completion of the<br />

soil placement and profiling.<br />

Employees must be issued with<br />

dust masks and instructed to use<br />

them.<br />

Dedicated haul roads must be<br />

used and on the roads, dust<br />

suppression must be undertaken<br />

daily.<br />

Remove build up carbonaceous<br />

layer from the R.O.M coal<br />

stockpiling areas, pollution control<br />

structures and the access/haul<br />

roads.<br />

The mine must have dedicated<br />

haul/access roads within the<br />

rehabilitation areas and dust<br />

suppression must be undertaken<br />

on these roads.<br />

Divert all storm water from this<br />

area to the pollution control dam.<br />

Note that the pollution control dam<br />

will not be removed until all areas<br />

generating dirty water are<br />

R 400 000<br />

No additional costs<br />

R 300 000<br />

No additional costs<br />

No additional costs<br />

No additional costs