NKOMATI ANTHRACITE (PTY) LIMITED - Sentula Mining
NKOMATI ANTHRACITE (PTY) LIMITED - Sentula Mining
NKOMATI ANTHRACITE (PTY) LIMITED - Sentula Mining
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 67<br />
and access roads). hards) along the haul roads may result in the<br />
contamination of virgin land (soil and<br />
vegetation) due to spillages along the roads.<br />
Leaking oils and fluids from trucks will result<br />
in the contamination of soils along the haul<br />
and access roads.<br />
Water to be stored in the pollution control dam<br />
will contain elevated chemical concentrations<br />
associated with coal mining. These may result<br />
in reduced pH levels, and thus elevated heavy<br />
metals in surface water quality within the<br />
natural water environment if allowed to enter<br />
the natural environment.<br />
<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD<br />
S M M<br />
Trucks transporting coal to the<br />
destined clients must cover the<br />
coal within tarpaulins to prevent<br />
spillages along the roads.<br />
Constructed speed humps along<br />
the roads.<br />
All roads to be inspected regularly<br />
for any spillages. Any spillages<br />
must be removed as soon as is<br />
practically possible.<br />
S<br />
H<br />
M<br />
Mine will always have oil spill<br />
remediation kits at the mine<br />
Haul roads must be graded<br />
regularly to remove the<br />
accumulated layer of coal material<br />
from the mine vehicles.<br />
Design and construct the pollution<br />
control dam to be able to handle<br />
the volumes of dirty water<br />
emanating from the mine. This dam<br />
will be lined with an appropriate<br />
layer to prevent seepage of dirty<br />
R 100 000<br />
R 200 000<br />
No additional costs<br />
No additional costs