Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />

<strong>Mining</strong> Project Page 58<br />

Construction of an initial box cut<br />

(opencast pit)<br />

The excavation of the initial box cuts will result in the<br />

disturbance of the geological profile.<br />

Carbonaceous material remaining from the removal of<br />

run of mine coal may cause acid mine drainage after<br />

rehabilitation of the opencast pits.<br />

The excavation of the initial box cuts will result in the<br />

formation of topographical voids, which will impact on<br />

the local topographical patterns.<br />

The stripping of soil layers during the construction of<br />

the initial box cut may result in the degradation of<br />

topsoil i.e. loss of the following i.e. original spatial<br />

distribution of soil types, original soil fertility, original<br />

soil depths and volume and natural functioning of the<br />

soil. Soil compaction will result from heavy vehicles.<br />

This will further impact on the land use and capability<br />

i.e. the current land use will be lost to mining.<br />

The activity will result in the removal of natural<br />

vegetation due to the stripping of topsoil.<br />

Animal burrows and habitats will be destroyed by the<br />

activities. This will further result in the migration of<br />

animals away from the areas of disturbance.<br />

<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD<br />

S<br />

S<br />

S<br />

S<br />

S<br />

S<br />

H<br />

H<br />

H<br />

H<br />

H<br />

H<br />

M<br />

M<br />

L<br />

M<br />

L<br />

L<br />

and implement safety, health and<br />

environmental programme for the mine.<br />

No mitigation can be undertaken for the<br />

predicted impact. However the mine will<br />

use removed material to backfill the<br />

opencast voids<br />

Reduce the exposure of the<br />

carbonaceous material to free oxygen.<br />

This will be achieved by placing the<br />

carbonaceous material at the bottom of<br />

the opencast pits and backfill as fast as<br />

possible.<br />

Use material from the successive cuts to<br />

backfill the voids created by the<br />

construction of the initial box cuts.<br />

Stockpile topsoil to appropriate height<br />

hence reducing loss of fertility. Avoid<br />

activity at stockpiles. Use of topsoil for<br />

rehabilitation of the backfilled opencast<br />

pits, hence rehabilitated areas can be<br />

used for other purposes.<br />

The topsoil used to cover the areas must<br />

be seeded with the recommended seed<br />

mixture.<br />

The rehabilitation of the disturbed areas<br />

will encourage the migration of animals<br />

back into the rehabilitated areas.<br />

N/A<br />

<strong>Mining</strong> cost<br />

<strong>Mining</strong> cost<br />

R 500 000<br />

No additional<br />

cost<br />

No cost