Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 80<br />
water areas of the mine, and no mining must be conducted within one hundred meters from a<br />
watercourse or within the 1:100 year floodline of the nearest streams, whichever is the greatest. All<br />
dirty water management structures must be designed to handle water from flood events (1:50 and<br />
1:100 year flood event).<br />
7.1.4 Re c o m m e n d a t i o n s R e l a t i n g t o I m p a c t s o n g r o u n d w a t e r<br />
Impacts that would result on groundwater will be the drawdown during mining and the migration of the<br />
pollution plume after mining. However, structures of preferred groundwater flow, like dolerite dykes<br />
and local fault zones or fissures could increase the effect considerably if encountered.<br />
In view of the above it is recommended that the static groundwater levels and ground water quality be<br />
monitored during the mining operation in order to confirm the predicted impacts and to determine if<br />
any unacceptable decrease of the yield or pollution of any affected boreholes, occurs. In such a<br />
situation the affected groundwater users must be compensated for the affected boreholes.<br />
7.1.5 Re c o m m e n d a t i o n s R e l a t i n g t o I n t e r e s t e d a n d Af f e c t e d P a r t i e s<br />
Nkomati Anthracite (Pty) Limited held several meetings with the leaders of community who are legally<br />
occupying and using the land on which the proposed mining operation will be undertaken. These<br />
meetings were used to determine concerns that the community may have on the proposed project.<br />
Based on the outcome of the meetings an agreement was reached between the community (via their<br />
leaders) and Nkomati Anthracite (Pty) Limited regarding the proposed mining operation. See<br />
Appendix 4 for a copy of the agreement between the Mawewe Royal Family Trust and Mawewe<br />
Community Trust and Nkomati Anthracite (Pty) Ltd.<br />
The objectives for this report were outlined in Section 1.4. These objectives were as follows:<br />
Present information to the authorities about the proposed project.<br />
Provide information regarding alternatives that have been considered by Nkomati Anthracite (Pty)<br />
Limited.<br />
Show how interested and affected parties will be afforded the opportunity to contribute to the project,<br />
to comment on the findings of the impact assessment and show that their issues were considered.<br />
Describe the baseline environment. A description of the receiving environment is given in Section 3.<br />
Describe the extent of environmental consequences for the construction, operating and closure<br />
phases. A summary of the impact assessment findings, for construction, operation and closure, is<br />
given in Section 6 and is supported by the specialist assessment reports.<br />
Proposed Mitigation Measures for impacts that are considered significant. Mitigation Measures are<br />
outlined in Section 6 and presented in more detail in the specialist reports and the EMP. A summary<br />
of recommendations is given in Section 7.1 above.<br />
Describe the environmental feasibility of the proposed project – the potential negative impacts relating<br />
to environment can be mitigated appropriately while significant socio-economic benefits to the<br />
country, could be realised if the project proceeds.<br />
Present findings of the EIA in a manner that facilitates decision-making. The completeness of<br />
information for decision-making is outlined in Section 7.4 below.<br />
7.2 E N V I R O N M E N T A L FEA S I B I L I T Y O F T H E PRO P O S E D PRO J E C T<br />
Based on the environmental assessment conducted as described in this EIA Report, there are no<br />
significant environmental impacts associated with the proposed project that cannot be mitigated.<br />