NKOMATI ANTHRACITE (PTY) LIMITED - Sentula Mining
NKOMATI ANTHRACITE (PTY) LIMITED - Sentula Mining
NKOMATI ANTHRACITE (PTY) LIMITED - Sentula Mining
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 40<br />
Petroleum Resources Development Act, Act 28 of 2002. In view of the above, a Scoping Report must<br />
be compiled and submitted to the Department of Mineral Resources for consideration, which will be<br />
followed by the compilation of the Environmental Impact Assessment and Environmental<br />
Management Report. On the other hand, the National Environmental Management Act, Act 107 of<br />
1998 requires that a Scoping Report must be submitted after submission of an application for<br />
authorisation.<br />
Nkomati Anthracite (Pty) Limited has in view of the above, compiled and submitted a Scoping report<br />
to the Department of Mineral Resources in terms of regulation 49 of the regulations under the<br />
Minerals and Petroleum Resources Development Act, Act 28 of 2002. The Scoping report was<br />
compiled according to the requirements of the Mineral and Petroleum Resources development Act,<br />
Act 28 of 2002, which partly complies with the requirements of the regulations under the National<br />
Environmental Management Act, Act 107 of 1998. The Scoping Report (MPRDA) was forwarded to<br />
the relevant commenting departments, which include the Department of Agriculture and Land<br />
Administration. Note that the Department of Agriculture and Land Administration has the mandate to<br />
ensure successful implementation of the National Environmental Management Act (Act 107 of 1998).<br />
5.2.4 I n f o r m a t i o n G a t h e r i n g<br />
Environmental baseline data has been obtained through various agencies, pertaining to surface water<br />
quantities and qualities, geohydrological data and modelling, topographical analyses, soil surveys<br />
(land capability), vegetation surveys, wetland surveys, fauna surveys, aquatic assessment and<br />
geological conditions. Weather data was acquired from the Agricultural Research Council, who has a<br />
weather station very close to Madadeni Opencast mining area. Historic land use was determined<br />
through available data and by visual observations made during various field studies. Monitoring<br />
programmes instituted by the mine and results thereof were also used in the compilation of this<br />
document. The above-mentioned accumulated data, which was analysed, is sufficient to gain a<br />
baseline indication of the present state of the environment. The use of this baseline study for impact<br />
assessments is thus justified, and reliable conclusions could be made.<br />
5.2.5 S p e c i al i s t s t u d i e s<br />
The following specialist studies were initiated for the purposes of this Impact Assessment Report:<br />
Soil survey over the Madadeni Opencast <strong>Mining</strong> Project Area<br />
Vegetation survey over the Madadeni Opencast <strong>Mining</strong> Project Area<br />
Geohydrological Survey over the Madadeni Opencast <strong>Mining</strong> Project Area and surrounds<br />
Surface water survey over the Madadeni Opencast <strong>Mining</strong> Project Area and surrounds (including<br />
wetlands)<br />
Geological investigation over the Madadeni Opencast <strong>Mining</strong> Project area<br />
Topographical survey over the over the Madadeni Opencast <strong>Mining</strong> Project Area<br />
5.2.6 I n t e g r a t i o n o f F i n d i n g s i n t o a F i n a l E I A R e p o rt<br />
All information generated for the proposed project is included in a Draft Environmental Impact<br />
Assessment Report with accompanying Specialist Reports. The findings of the specialist studies<br />
were summarised and integrated in this report.<br />
A final draft EIA Report will be prepared after the public review of the Draft EIA Report and will<br />
incorporate comments made by interested and affected parties during the public review period. This<br />
EIA Report will be submitted to MDALA and other authorities for consideration.<br />
<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD